whatsapp Icon

Projects


400+ key projects delivered, transforming the
technology landscape of Kuwait

In 1960, the feat of delivering multiple 100s of technological projects that change people’s life in Kuwait would have seemed an unachievable dream, a magic, for our founders. But under the beacons of lights they lit, with untiring inspiration and passion, we did it, and are charging ahead with even bigger dreams.

ACC Projects

Projects Image

DGCA

Design, Supply, Installation, Training, Warranty, Maintenance and Technical Support of KADIN Expansion Integration / Licenses at Kuwait International Airport

arrow
Projects Image

Ministry of Interior

Maintenance of security surveillance systems - cameras for the General Administration of Land Border Security and its centers at the northern and southern borders.

arrow
Projects Image

Kuwait Ports Authority

Supply and installation of new navigational devices systems with warranty, maintenance, and training, including spare parts.

arrow

DGCA

The Kuwait Airport Data Interchange Network (KADIN) is designed to be the single unified communications infrastructure at Kuwait International Airport, connecting facilities as required. KADIN comprises an outside infrastructure consisting of manholes, hand holes, duct banks and single mode F.O. cabling, and active equipment forming an IP/MPLS cloud with associated network management and traffic engineering capabilities. KADIN currently serves predominantly Air Traffic Management, Air Navigation and Meteorological systems at Kuwait International airport. The KADIN IP/MPLS cloud has the capability to develop into the intended single communications infrastructure for the airport. The KADIN+ project builds upon the KADIN project at Kuwait International Airport.

Design, Manufacture, Supply, Installation, Commissioning, Providing of Training, Warranty, Maintenance and Technical Support of KADIN Expansion & PABX Integration at Kuwait International Airport (KADIN Plus). The Scope of work undertaken is summarized as follows:.

  • Local Area Networks for the new Air Traffic Control Tower
  • Rationalization of KADIN 
  • Increase of capacity and bandwidth
  • Increase of Functionality 
  • Connection of new facilities. 
  • OSP & Civil works.

Ministry of Interior

The main objective of the Maintenance Support service is to ensure the integrity and proper functioning of all system components by performing the following activities:

  • Performing regular preventive / repair and corrective maintenance which consists of maintenance for Outdoor Fixed cameras, Indoor Fixed Dome cameras, Video Recorder system, Access switches, UPS system, Fiber Patch panels & Electrical DB
  • To prepare all necessary maintenance schedules (PM & CM)
  • Replacing faulty items using spare parts 
  • Providing maintenance support for the staff 
  • Reporting the systems performance to the customer

Kuwait Ports Authority

The system comprises of and implements the following equipments/subsystems and then auxiliary.

ACC has borne complete responsibility of procurement / development of all the above equipment/sub-stems. These responsibilities include installation, commissioning and testing of the complete system including the interfacing of all the equipments. The details of civil works carried out for the total execution are:-

  • Tracking System. 
  • VTMS Computer System.
  • AIS System.
  • VHF System. 
  • CCTV system 
  • Voice recording and replay system. 
  • Communication Link (Microwave Link). 
  • Meteorological sensors.
  • Electrical Power System (including UPS and Generators).
  • Electrical Power System (including UPS and Generators.
Projects Image

Kuwait Fire Force

Contract # 22/2021/2022 Supply, Installation & Commissioning for Microwave network

arrow
Projects Image

Ministry of Defense

Maritime Traffic Coordination Center – MTCC Kuwait

arrow
Projects Image

DGCA AVIC

Extending KADIN to PK3 project (Runway-3)

arrow

DGCA

The Kuwait Airport Data Interchange Network (KADIN) is designed to be the single unified communications infrastructure at Kuwait International Airport, connecting facilities as required. KADIN comprises an outside infrastructure consisting of manholes, hand holes, duct banks and single mode F.O. cabling, and active equipment forming an IP/MPLS cloud with associated network management and traffic engineering capabilities. KADIN currently serves predominantly Air Traffic Management, Air Navigation and Meteorological systems at Kuwait International airport. The KADIN IP/MPLS cloud has the capability to develop into the intended single communications infrastructure for the airport. The KADIN+ project builds upon the KADIN project at Kuwait International Airport.

Design, Manufacture, Supply, Installation, Commissioning, Providing of Training, Warranty, Maintenance and Technical Support of KADIN Expansion & PABX Integration at Kuwait International Airport (KADIN Plus). The Scope of work undertaken is summarized as follows:.

  • Local Area Networks for the new Air Traffic Control Tower
  • Rationalization of KADIN 
  • Increase of capacity and bandwidth
  • Increase of Functionality 
  • Connection of new facilities. 
  • OSP & Civil works.

Ministry of Interior

The main objective of the Maintenance Support service is to ensure the integrity and proper functioning of all system components by performing the following activities:

  • Performing regular preventive / repair and corrective maintenance which consists of maintenance for Outdoor Fixed cameras, Indoor Fixed Dome cameras, Video Recorder system, Access switches, UPS system, Fiber Patch panels & Electrical DB
  • To prepare all necessary maintenance schedules (PM & CM)
  • Replacing faulty items using spare parts 
  • Providing maintenance support for the staff 
  • Reporting the systems performance to the customer

Kuwait Ports Authority

The system comprises of and implements the following equipments/subsystems and then auxiliary.

ACC has borne complete responsibility of procurement / development of all the above equipment/sub-stems. These responsibilities include installation, commissioning and testing of the complete system including the interfacing of all the equipments. The details of civil works carried out for the total execution are:-

  • Tracking System. 
  • VTMS Computer System.
  • AIS System.
  • VHF System. 
  • CCTV system 
  • Voice recording and replay system. 
  • Communication Link (Microwave Link). 
  • Meteorological sensors.
  • Electrical Power System (including UPS and Generators).
  • Electrical Power System (including UPS and Generators.

Kuwait Fire Force

Turnkey solution including survey, design, delivery, installation, commissioning, training, warranty, and maintenance support for a Microwave communication network and related subsystems to support and extend backhaul operations between KFSD Control Centers and fixed and mobile assets.

The required microwave network integrates with and extends existing network services. The network is based on open digital standards for public safety as a Turnkey solution including all hardware, software, and civil infrastructure components.

Ministry of Defense

CSS and Communications Equipment - Installation, Integration, Configuration, Testing, Commissioning, As-builts, OMSI, Training etc. for the following Sub-systems:

  • CSS Coastal Surveillance System
  • CIP Software Application (CIP - Critical Infrastructure Protection)
  • Tactical Radar System (Antenna, ACU, Transceivers, Waveguides)
  • Long / Short Range Camera
  • Thermal Sensors
  • AIS Base Station Transponder
  • Audio / Video Recording Servers
  • Bridge Consoles
  • METEO Weather Station
  • GMDSS System
  • HF Radios /Maritime VHF
  • Aeronautical VHF/UHF
  • Tetra Radios
  • Multiband Networking Manpack Radio
  • HF Software Defined Radio
  • Wideband HF/VHF Tactical Radio System
  • Radio Base Station
  • IP Advanced Radio System
  • TVRO Solution
  • LAN for Office & Voice Networks
  • Wireless LAN
  • UPS system
  • Aeronautical Non-directional Beacon
  • Radio Dispatching and Recording Systems

DGCA AVIC

The scope consists of connecting the applications interface cables & fiber cables to the KADIN racks/ and connecting the racks to room bus and electrical DB in existing grounded trays.

Projects Image

Kuwait National Guard

Supply of Security Systems and Platforms to provide Specialized Technical Services and training to protect E-Systems, Informatics and Infrastructure from Cyber Attacks and Intrusions (Cyber Security)

arrow
Projects Image

DGCA - Intelcan

Contract # KUW02-002 ILS/DME Civil Works and Power Kuwait RWY-3

arrow
Projects Image

DGCA - Intelcan

Contract # KUW02-001 ILS/DME KADIN Infrastructure Kuwait RWY-3

arrow

DGCA

The Kuwait Airport Data Interchange Network (KADIN) is designed to be the single unified communications infrastructure at Kuwait International Airport, connecting facilities as required. KADIN comprises an outside infrastructure consisting of manholes, hand holes, duct banks and single mode F.O. cabling, and active equipment forming an IP/MPLS cloud with associated network management and traffic engineering capabilities. KADIN currently serves predominantly Air Traffic Management, Air Navigation and Meteorological systems at Kuwait International airport. The KADIN IP/MPLS cloud has the capability to develop into the intended single communications infrastructure for the airport. The KADIN+ project builds upon the KADIN project at Kuwait International Airport.

Design, Manufacture, Supply, Installation, Commissioning, Providing of Training, Warranty, Maintenance and Technical Support of KADIN Expansion & PABX Integration at Kuwait International Airport (KADIN Plus). The Scope of work undertaken is summarized as follows:.

  • Local Area Networks for the new Air Traffic Control Tower
  • Rationalization of KADIN 
  • Increase of capacity and bandwidth
  • Increase of Functionality 
  • Connection of new facilities. 
  • OSP & Civil works.

Ministry of Interior

The main objective of the Maintenance Support service is to ensure the integrity and proper functioning of all system components by performing the following activities:

  • Performing regular preventive / repair and corrective maintenance which consists of maintenance for Outdoor Fixed cameras, Indoor Fixed Dome cameras, Video Recorder system, Access switches, UPS system, Fiber Patch panels & Electrical DB
  • To prepare all necessary maintenance schedules (PM & CM)
  • Replacing faulty items using spare parts 
  • Providing maintenance support for the staff 
  • Reporting the systems performance to the customer

Kuwait Ports Authority

The system comprises of and implements the following equipments/subsystems and then auxiliary.

ACC has borne complete responsibility of procurement / development of all the above equipment/sub-stems. These responsibilities include installation, commissioning and testing of the complete system including the interfacing of all the equipments. The details of civil works carried out for the total execution are:-

  • Tracking System. 
  • VTMS Computer System.
  • AIS System.
  • VHF System. 
  • CCTV system 
  • Voice recording and replay system. 
  • Communication Link (Microwave Link). 
  • Meteorological sensors.
  • Electrical Power System (including UPS and Generators).
  • Electrical Power System (including UPS and Generators.

Kuwait Fire Force

Turnkey solution including survey, design, delivery, installation, commissioning, training, warranty, and maintenance support for a Microwave communication network and related subsystems to support and extend backhaul operations between KFSD Control Centers and fixed and mobile assets.

The required microwave network integrates with and extends existing network services. The network is based on open digital standards for public safety as a Turnkey solution including all hardware, software, and civil infrastructure components.

Ministry of Defense

CSS and Communications Equipment - Installation, Integration, Configuration, Testing, Commissioning, As-builts, OMSI, Training etc. for the following Sub-systems:

  • CSS Coastal Surveillance System
  • CIP Software Application (CIP - Critical Infrastructure Protection)
  • Tactical Radar System (Antenna, ACU, Transceivers, Waveguides)
  • Long / Short Range Camera
  • Thermal Sensors
  • AIS Base Station Transponder
  • Audio / Video Recording Servers
  • Bridge Consoles
  • METEO Weather Station
  • GMDSS System
  • HF Radios /Maritime VHF
  • Aeronautical VHF/UHF
  • Tetra Radios
  • Multiband Networking Manpack Radio
  • HF Software Defined Radio
  • Wideband HF/VHF Tactical Radio System
  • Radio Base Station
  • IP Advanced Radio System
  • TVRO Solution
  • LAN for Office & Voice Networks
  • Wireless LAN
  • UPS system
  • Aeronautical Non-directional Beacon
  • Radio Dispatching and Recording Systems

DGCA AVIC

The scope consists of connecting the applications interface cables & fiber cables to the KADIN racks/ and connecting the racks to room bus and electrical DB in existing grounded trays.

Kuwait National Guard

The Information security enhancement program contains the following:


Part 1: Cybersecurity solutions and services:

    Products Implementation Requirements:

  • Content security (Email) 
  • Data center security 
  • Identity security(only 802.1x) 
  • Network flow security analysis 
  • Malware protection and sandboxing 
  • DNS security 
  • Security Operations Management 
  • End points security 
  • Threat Intelligence 
  • Layer 4 data encryption solution 
  • Products implementations professional services
  • Managed Detect and Response Services (MDR):

  • 24x7 Security Monitoring Service
  • Incident Response Service
  • Proactive Threat Hunting

Part 2: Project Management and Cybersecurity Consultancy Services;

  • Project Management Professional Services 
  • Cybersecurity Strategy 
  • Detailed Cybersecurity Framework 
  • Maturity Model Assessment 
  • Risk Assessment and Recommendations 
  • IT Consolidated Asset Register 
  • Security Posture Assessment 
  • Incident Response Process Development
  • Security Policy and Procedure
  • ISO 27001 Assessment and Gaps Report
  • ISO 27001 Certification
  • Security Roadmap

DGCA - Intelcan

The sole and primary objective of this Subcontract is to perform the Civil Works required for the installation of the ILS systems (LLZ15R, GP15R, LLZ33L and GP33L) and complete installation of the power infrastructure to energize and earthing the ILS elements. Civil works includes - Concrete foundations for antennas, shelters, Field Test Paths and Test Points, Trenching and Piping, Access Road and Parking Lot.

DGCA - Intelcan

The sole and primary objective of this Subcontract is to connect the ILS systems (LLZ15R, GP15R, LLZ33L and GP33L) to the KADIN system, similar to the KADIN connection of the existing runways in TURN KEY conditions.

Projects Image

Ministry of Interior

Maintenance Services required for supporting Land border security sites networking and application systems for two years.

arrow
Projects Image

Public Authority for Industry

Installation, operation, connection, and maintenance and service continuity for the centers connected with the General Authority for Fiber and Training - Phase III

arrow
Projects Image

DEERNS

Supply, Installation, Commissioning, Training, Warranty, Maintenance & Technical Support of Document Control System (DCS).

arrow

DGCA

The Kuwait Airport Data Interchange Network (KADIN) is designed to be the single unified communications infrastructure at Kuwait International Airport, connecting facilities as required. KADIN comprises an outside infrastructure consisting of manholes, hand holes, duct banks and single mode F.O. cabling, and active equipment forming an IP/MPLS cloud with associated network management and traffic engineering capabilities. KADIN currently serves predominantly Air Traffic Management, Air Navigation and Meteorological systems at Kuwait International airport. The KADIN IP/MPLS cloud has the capability to develop into the intended single communications infrastructure for the airport. The KADIN+ project builds upon the KADIN project at Kuwait International Airport.

Design, Manufacture, Supply, Installation, Commissioning, Providing of Training, Warranty, Maintenance and Technical Support of KADIN Expansion & PABX Integration at Kuwait International Airport (KADIN Plus). The Scope of work undertaken is summarized as follows:.

  • Local Area Networks for the new Air Traffic Control Tower
  • Rationalization of KADIN 
  • Increase of capacity and bandwidth
  • Increase of Functionality 
  • Connection of new facilities. 
  • OSP & Civil works.

Ministry of Interior

The main objective of the Maintenance Support service is to ensure the integrity and proper functioning of all system components by performing the following activities:

  • Performing regular preventive / repair and corrective maintenance which consists of maintenance for Outdoor Fixed cameras, Indoor Fixed Dome cameras, Video Recorder system, Access switches, UPS system, Fiber Patch panels & Electrical DB
  • To prepare all necessary maintenance schedules (PM & CM)
  • Replacing faulty items using spare parts 
  • Providing maintenance support for the staff 
  • Reporting the systems performance to the customer

Kuwait Ports Authority

The system comprises of and implements the following equipments/subsystems and then auxiliary.

ACC has borne complete responsibility of procurement / development of all the above equipment/sub-stems. These responsibilities include installation, commissioning and testing of the complete system including the interfacing of all the equipments. The details of civil works carried out for the total execution are:-

  • Tracking System. 
  • VTMS Computer System.
  • AIS System.
  • VHF System. 
  • CCTV system 
  • Voice recording and replay system. 
  • Communication Link (Microwave Link). 
  • Meteorological sensors.
  • Electrical Power System (including UPS and Generators).
  • Electrical Power System (including UPS and Generators.

Kuwait Fire Force

Turnkey solution including survey, design, delivery, installation, commissioning, training, warranty, and maintenance support for a Microwave communication network and related subsystems to support and extend backhaul operations between KFSD Control Centers and fixed and mobile assets.

The required microwave network integrates with and extends existing network services. The network is based on open digital standards for public safety as a Turnkey solution including all hardware, software, and civil infrastructure components.

Ministry of Defense

CSS and Communications Equipment - Installation, Integration, Configuration, Testing, Commissioning, As-builts, OMSI, Training etc. for the following Sub-systems:

  • CSS Coastal Surveillance System
  • CIP Software Application (CIP - Critical Infrastructure Protection)
  • Tactical Radar System (Antenna, ACU, Transceivers, Waveguides)
  • Long / Short Range Camera
  • Thermal Sensors
  • AIS Base Station Transponder
  • Audio / Video Recording Servers
  • Bridge Consoles
  • METEO Weather Station
  • GMDSS System
  • HF Radios /Maritime VHF
  • Aeronautical VHF/UHF
  • Tetra Radios
  • Multiband Networking Manpack Radio
  • HF Software Defined Radio
  • Wideband HF/VHF Tactical Radio System
  • Radio Base Station
  • IP Advanced Radio System
  • TVRO Solution
  • LAN for Office & Voice Networks
  • Wireless LAN
  • UPS system
  • Aeronautical Non-directional Beacon
  • Radio Dispatching and Recording Systems

DGCA AVIC

The scope consists of connecting the applications interface cables & fiber cables to the KADIN racks/ and connecting the racks to room bus and electrical DB in existing grounded trays.

Kuwait National Guard

The Information security enhancement program contains the following:


Part 1: Cybersecurity solutions and services:

    Products Implementation Requirements:

  • Content security (Email) 
  • Data center security 
  • Identity security(only 802.1x) 
  • Network flow security analysis 
  • Malware protection and sandboxing 
  • DNS security 
  • Security Operations Management 
  • End points security 
  • Threat Intelligence 
  • Layer 4 data encryption solution 
  • Products implementations professional services
  • Managed Detect and Response Services (MDR):

  • 24x7 Security Monitoring Service
  • Incident Response Service
  • Proactive Threat Hunting

Part 2: Project Management and Cybersecurity Consultancy Services;

  • Project Management Professional Services 
  • Cybersecurity Strategy 
  • Detailed Cybersecurity Framework 
  • Maturity Model Assessment 
  • Risk Assessment and Recommendations 
  • IT Consolidated Asset Register 
  • Security Posture Assessment 
  • Incident Response Process Development
  • Security Policy and Procedure
  • ISO 27001 Assessment and Gaps Report
  • ISO 27001 Certification
  • Security Roadmap

DGCA - Intelcan

The sole and primary objective of this Subcontract is to perform the Civil Works required for the installation of the ILS systems (LLZ15R, GP15R, LLZ33L and GP33L) and complete installation of the power infrastructure to energize and earthing the ILS elements. Civil works includes - Concrete foundations for antennas, shelters, Field Test Paths and Test Points, Trenching and Piping, Access Road and Parking Lot.

DGCA - Intelcan

The sole and primary objective of this Subcontract is to connect the ILS systems (LLZ15R, GP15R, LLZ33L and GP33L) to the KADIN system, similar to the KADIN connection of the existing runways in TURN KEY conditions.

Ministry of Interior

The main objective of the Maintenance Support service is to ensure the integrity and proper functioning of all system components through the following activities:

  • Performing regular preventive / repair and corrective maintenance which consists of maintenance for Core switches, Access switches, call manager, Executive Phone, Business Phone, PSTN digital Voice gateway, Unite unified Messaging For 200 users with Enterprise Messaging system for 500 users, Servers, electrical items at Server room, Fire Alarm system, CCTV system, Access control system, UPS system, FOC cables between HQ and border sites, EQ Cabinets, Cabling system & Data points distribution. 
  • Preparing all necessary maintenance schedules (PM & CM)
  • Replacing faulty items using spare parts 
  • Providing maintenance support for the trained staff.
  • Providing maintenance training for the new staff 
  • Reporting the systems performance to the customer.

On-site maintenance support as per the MOI working time and on call 24-hours per day to maintain the system performance.

Public Authority for Industry

Supply, installation and maintenance for 75 Km of 48 Core fiber optic cable, and 1 km of 12 core fiber optic cable for the Public Authority of Industry, to establish optical fiber links connectivity from Head Quarter (South Surra) to Six of PAI locations i.e Sulaibia , Ardiya, Mina Abdullah, Free Zone, Airport and Fahaheel Area.

DEERNS

Supply, Installation, Commissioning, Providing of Training, Warranty, Maintenance & Technical Support of Document Control System (DCS) at DGCA Planning & Control Dept. and other beneficiary Depts related to Meteorology & Navigational Projects.

  • Document Control System.
  • Networking cabling.
  • Computer room preparation and cablings.
  • Network Management Systems.
  • Cable Management System Specific Training.
Projects Image

Public Authority of Manpower

Installation & Maintenance For Fiber Optic Cable

arrow
Projects Image

Ministry of Communication

Kuwait MOC GPON Phase-II

arrow
Projects Image

Kuwait Ports Authority

Rent and Maintenance of Navigational Devices.

arrow

DGCA

The Kuwait Airport Data Interchange Network (KADIN) is designed to be the single unified communications infrastructure at Kuwait International Airport, connecting facilities as required. KADIN comprises an outside infrastructure consisting of manholes, hand holes, duct banks and single mode F.O. cabling, and active equipment forming an IP/MPLS cloud with associated network management and traffic engineering capabilities. KADIN currently serves predominantly Air Traffic Management, Air Navigation and Meteorological systems at Kuwait International airport. The KADIN IP/MPLS cloud has the capability to develop into the intended single communications infrastructure for the airport. The KADIN+ project builds upon the KADIN project at Kuwait International Airport.

Design, Manufacture, Supply, Installation, Commissioning, Providing of Training, Warranty, Maintenance and Technical Support of KADIN Expansion & PABX Integration at Kuwait International Airport (KADIN Plus). The Scope of work undertaken is summarized as follows:.

  • Local Area Networks for the new Air Traffic Control Tower
  • Rationalization of KADIN 
  • Increase of capacity and bandwidth
  • Increase of Functionality 
  • Connection of new facilities. 
  • OSP & Civil works.

Ministry of Interior

The main objective of the Maintenance Support service is to ensure the integrity and proper functioning of all system components by performing the following activities:

  • Performing regular preventive / repair and corrective maintenance which consists of maintenance for Outdoor Fixed cameras, Indoor Fixed Dome cameras, Video Recorder system, Access switches, UPS system, Fiber Patch panels & Electrical DB
  • To prepare all necessary maintenance schedules (PM & CM)
  • Replacing faulty items using spare parts 
  • Providing maintenance support for the staff 
  • Reporting the systems performance to the customer

Kuwait Ports Authority

The system comprises of and implements the following equipments/subsystems and then auxiliary.

ACC has borne complete responsibility of procurement / development of all the above equipment/sub-stems. These responsibilities include installation, commissioning and testing of the complete system including the interfacing of all the equipments. The details of civil works carried out for the total execution are:-

  • Tracking System. 
  • VTMS Computer System.
  • AIS System.
  • VHF System. 
  • CCTV system 
  • Voice recording and replay system. 
  • Communication Link (Microwave Link). 
  • Meteorological sensors.
  • Electrical Power System (including UPS and Generators).
  • Electrical Power System (including UPS and Generators.

Kuwait Fire Force

Turnkey solution including survey, design, delivery, installation, commissioning, training, warranty, and maintenance support for a Microwave communication network and related subsystems to support and extend backhaul operations between KFSD Control Centers and fixed and mobile assets.

The required microwave network integrates with and extends existing network services. The network is based on open digital standards for public safety as a Turnkey solution including all hardware, software, and civil infrastructure components.

Ministry of Defense

CSS and Communications Equipment - Installation, Integration, Configuration, Testing, Commissioning, As-builts, OMSI, Training etc. for the following Sub-systems:

  • CSS Coastal Surveillance System
  • CIP Software Application (CIP - Critical Infrastructure Protection)
  • Tactical Radar System (Antenna, ACU, Transceivers, Waveguides)
  • Long / Short Range Camera
  • Thermal Sensors
  • AIS Base Station Transponder
  • Audio / Video Recording Servers
  • Bridge Consoles
  • METEO Weather Station
  • GMDSS System
  • HF Radios /Maritime VHF
  • Aeronautical VHF/UHF
  • Tetra Radios
  • Multiband Networking Manpack Radio
  • HF Software Defined Radio
  • Wideband HF/VHF Tactical Radio System
  • Radio Base Station
  • IP Advanced Radio System
  • TVRO Solution
  • LAN for Office & Voice Networks
  • Wireless LAN
  • UPS system
  • Aeronautical Non-directional Beacon
  • Radio Dispatching and Recording Systems

DGCA AVIC

The scope consists of connecting the applications interface cables & fiber cables to the KADIN racks/ and connecting the racks to room bus and electrical DB in existing grounded trays.

Kuwait National Guard

The Information security enhancement program contains the following:


Part 1: Cybersecurity solutions and services:

    Products Implementation Requirements:

  • Content security (Email) 
  • Data center security 
  • Identity security(only 802.1x) 
  • Network flow security analysis 
  • Malware protection and sandboxing 
  • DNS security 
  • Security Operations Management 
  • End points security 
  • Threat Intelligence 
  • Layer 4 data encryption solution 
  • Products implementations professional services
  • Managed Detect and Response Services (MDR):

  • 24x7 Security Monitoring Service
  • Incident Response Service
  • Proactive Threat Hunting

Part 2: Project Management and Cybersecurity Consultancy Services;

  • Project Management Professional Services 
  • Cybersecurity Strategy 
  • Detailed Cybersecurity Framework 
  • Maturity Model Assessment 
  • Risk Assessment and Recommendations 
  • IT Consolidated Asset Register 
  • Security Posture Assessment 
  • Incident Response Process Development
  • Security Policy and Procedure
  • ISO 27001 Assessment and Gaps Report
  • ISO 27001 Certification
  • Security Roadmap

DGCA - Intelcan

The sole and primary objective of this Subcontract is to perform the Civil Works required for the installation of the ILS systems (LLZ15R, GP15R, LLZ33L and GP33L) and complete installation of the power infrastructure to energize and earthing the ILS elements. Civil works includes - Concrete foundations for antennas, shelters, Field Test Paths and Test Points, Trenching and Piping, Access Road and Parking Lot.

DGCA - Intelcan

The sole and primary objective of this Subcontract is to connect the ILS systems (LLZ15R, GP15R, LLZ33L and GP33L) to the KADIN system, similar to the KADIN connection of the existing runways in TURN KEY conditions.

Ministry of Interior

The main objective of the Maintenance Support service is to ensure the integrity and proper functioning of all system components through the following activities:

  • Performing regular preventive / repair and corrective maintenance which consists of maintenance for Core switches, Access switches, call manager, Executive Phone, Business Phone, PSTN digital Voice gateway, Unite unified Messaging For 200 users with Enterprise Messaging system for 500 users, Servers, electrical items at Server room, Fire Alarm system, CCTV system, Access control system, UPS system, FOC cables between HQ and border sites, EQ Cabinets, Cabling system & Data points distribution. 
  • Preparing all necessary maintenance schedules (PM & CM)
  • Replacing faulty items using spare parts 
  • Providing maintenance support for the trained staff.
  • Providing maintenance training for the new staff 
  • Reporting the systems performance to the customer.

On-site maintenance support as per the MOI working time and on call 24-hours per day to maintain the system performance.

Public Authority for Industry

Supply, installation and maintenance for 75 Km of 48 Core fiber optic cable, and 1 km of 12 core fiber optic cable for the Public Authority of Industry, to establish optical fiber links connectivity from Head Quarter (South Surra) to Six of PAI locations i.e Sulaibia , Ardiya, Mina Abdullah, Free Zone, Airport and Fahaheel Area.

DEERNS

Supply, Installation, Commissioning, Providing of Training, Warranty, Maintenance & Technical Support of Document Control System (DCS) at DGCA Planning & Control Dept. and other beneficiary Depts related to Meteorology & Navigational Projects.

  • Document Control System.
  • Networking cabling.
  • Computer room preparation and cablings.
  • Network Management Systems.
  • Cable Management System Specific Training.

Public Authority of Manpower

Supply, installation and maintenance for 40 Km of 12 Core fiber optic cable for the Public Authority of Manpower, connecting 9 PAM facilities to the nearest MOC exchange along with terminating and testing all fiber optic cables.

Phase II is under execution, consisting of installation for 35 KM of 12 Core Fiber optic cable connecting 5 PAM facilities to the nearest MOC exchange along with terminating and testing all fiber optic cables.

Ministry of Communication

ACC- Subcontractor of Huawei and its scope of work as follows:

  • Detailed demand survey and identification of the number of building of houses by vacant plots, under construction.
  • Supply of all civil materials, tools and vehicles to perform all services related to civil works for laying PVC 110 pipes, construction of handholes, manholes, etc to allow pulling subducts, fiber optic cables.
  • Splicing and termination of Fiber Optic Cables inside MOC exchanges and customer home/buildings.
  • Installation of FTTH/GPON components, like splitter cabinets/closures termination box.
  • Conducting the Optical Test measurements (OTDR, OLTS).
  • As-built Documentation in AutoCAD.

Kuwait Ports Authority

A wide range of Sensors System Connectivity for Port Authority including:-


  • Radio Communications & recorders.
  • Maritime Sensors. 
  • Weather Sensors. 
  • Oceanographic Sensors. 
  • Telemetry Network and Unified Sensors Display Application. 
  • Installation in Port Towers, Under sea water and in ships. 
  • Data transfer and communication devices .
  • Communication and information transfer systems.
  • LAN / WAN.
Projects Image

National Bank of Kuwait

Supply and Installation of 96core Fiber Optic Cable.

arrow
Projects Image

Kuwait National Guard

Implementation of several Application-Suites that are based on SAP, IBM, Microsoft and OpenText platforms, in addition to the migration of legacy data as well as digitization services.

arrow
Projects Image

DGCA

Design, Manufacture, Supply, Install, Commission, Training, Maintenance, Technical Support and Warranty of Kuwait Airport Data Interchange Network (KADIN) for the State of Kuwait.

arrow

DGCA

The Kuwait Airport Data Interchange Network (KADIN) is designed to be the single unified communications infrastructure at Kuwait International Airport, connecting facilities as required. KADIN comprises an outside infrastructure consisting of manholes, hand holes, duct banks and single mode F.O. cabling, and active equipment forming an IP/MPLS cloud with associated network management and traffic engineering capabilities. KADIN currently serves predominantly Air Traffic Management, Air Navigation and Meteorological systems at Kuwait International airport. The KADIN IP/MPLS cloud has the capability to develop into the intended single communications infrastructure for the airport. The KADIN+ project builds upon the KADIN project at Kuwait International Airport.

Design, Manufacture, Supply, Installation, Commissioning, Providing of Training, Warranty, Maintenance and Technical Support of KADIN Expansion & PABX Integration at Kuwait International Airport (KADIN Plus). The Scope of work undertaken is summarized as follows:.

  • Local Area Networks for the new Air Traffic Control Tower
  • Rationalization of KADIN 
  • Increase of capacity and bandwidth
  • Increase of Functionality 
  • Connection of new facilities. 
  • OSP & Civil works.

Ministry of Interior

The main objective of the Maintenance Support service is to ensure the integrity and proper functioning of all system components by performing the following activities:

  • Performing regular preventive / repair and corrective maintenance which consists of maintenance for Outdoor Fixed cameras, Indoor Fixed Dome cameras, Video Recorder system, Access switches, UPS system, Fiber Patch panels & Electrical DB
  • To prepare all necessary maintenance schedules (PM & CM)
  • Replacing faulty items using spare parts 
  • Providing maintenance support for the staff 
  • Reporting the systems performance to the customer

Kuwait Ports Authority

The system comprises of and implements the following equipments/subsystems and then auxiliary.

ACC has borne complete responsibility of procurement / development of all the above equipment/sub-stems. These responsibilities include installation, commissioning and testing of the complete system including the interfacing of all the equipments. The details of civil works carried out for the total execution are:-

  • Tracking System. 
  • VTMS Computer System.
  • AIS System.
  • VHF System. 
  • CCTV system 
  • Voice recording and replay system. 
  • Communication Link (Microwave Link). 
  • Meteorological sensors.
  • Electrical Power System (including UPS and Generators).
  • Electrical Power System (including UPS and Generators.

Kuwait Fire Force

Turnkey solution including survey, design, delivery, installation, commissioning, training, warranty, and maintenance support for a Microwave communication network and related subsystems to support and extend backhaul operations between KFSD Control Centers and fixed and mobile assets.

The required microwave network integrates with and extends existing network services. The network is based on open digital standards for public safety as a Turnkey solution including all hardware, software, and civil infrastructure components.

Ministry of Defense

CSS and Communications Equipment - Installation, Integration, Configuration, Testing, Commissioning, As-builts, OMSI, Training etc. for the following Sub-systems:

  • CSS Coastal Surveillance System
  • CIP Software Application (CIP - Critical Infrastructure Protection)
  • Tactical Radar System (Antenna, ACU, Transceivers, Waveguides)
  • Long / Short Range Camera
  • Thermal Sensors
  • AIS Base Station Transponder
  • Audio / Video Recording Servers
  • Bridge Consoles
  • METEO Weather Station
  • GMDSS System
  • HF Radios /Maritime VHF
  • Aeronautical VHF/UHF
  • Tetra Radios
  • Multiband Networking Manpack Radio
  • HF Software Defined Radio
  • Wideband HF/VHF Tactical Radio System
  • Radio Base Station
  • IP Advanced Radio System
  • TVRO Solution
  • LAN for Office & Voice Networks
  • Wireless LAN
  • UPS system
  • Aeronautical Non-directional Beacon
  • Radio Dispatching and Recording Systems

DGCA AVIC

The scope consists of connecting the applications interface cables & fiber cables to the KADIN racks/ and connecting the racks to room bus and electrical DB in existing grounded trays.

Kuwait National Guard

The Information security enhancement program contains the following:


Part 1: Cybersecurity solutions and services:

    Products Implementation Requirements:

  • Content security (Email) 
  • Data center security 
  • Identity security(only 802.1x) 
  • Network flow security analysis 
  • Malware protection and sandboxing 
  • DNS security 
  • Security Operations Management 
  • End points security 
  • Threat Intelligence 
  • Layer 4 data encryption solution 
  • Products implementations professional services
  • Managed Detect and Response Services (MDR):

  • 24x7 Security Monitoring Service
  • Incident Response Service
  • Proactive Threat Hunting

Part 2: Project Management and Cybersecurity Consultancy Services;

  • Project Management Professional Services 
  • Cybersecurity Strategy 
  • Detailed Cybersecurity Framework 
  • Maturity Model Assessment 
  • Risk Assessment and Recommendations 
  • IT Consolidated Asset Register 
  • Security Posture Assessment 
  • Incident Response Process Development
  • Security Policy and Procedure
  • ISO 27001 Assessment and Gaps Report
  • ISO 27001 Certification
  • Security Roadmap

DGCA - Intelcan

The sole and primary objective of this Subcontract is to perform the Civil Works required for the installation of the ILS systems (LLZ15R, GP15R, LLZ33L and GP33L) and complete installation of the power infrastructure to energize and earthing the ILS elements. Civil works includes - Concrete foundations for antennas, shelters, Field Test Paths and Test Points, Trenching and Piping, Access Road and Parking Lot.

DGCA - Intelcan

The sole and primary objective of this Subcontract is to connect the ILS systems (LLZ15R, GP15R, LLZ33L and GP33L) to the KADIN system, similar to the KADIN connection of the existing runways in TURN KEY conditions.

Ministry of Interior

The main objective of the Maintenance Support service is to ensure the integrity and proper functioning of all system components through the following activities:

  • Performing regular preventive / repair and corrective maintenance which consists of maintenance for Core switches, Access switches, call manager, Executive Phone, Business Phone, PSTN digital Voice gateway, Unite unified Messaging For 200 users with Enterprise Messaging system for 500 users, Servers, electrical items at Server room, Fire Alarm system, CCTV system, Access control system, UPS system, FOC cables between HQ and border sites, EQ Cabinets, Cabling system & Data points distribution. 
  • Preparing all necessary maintenance schedules (PM & CM)
  • Replacing faulty items using spare parts 
  • Providing maintenance support for the trained staff.
  • Providing maintenance training for the new staff 
  • Reporting the systems performance to the customer.

On-site maintenance support as per the MOI working time and on call 24-hours per day to maintain the system performance.

Public Authority for Industry

Supply, installation and maintenance for 75 Km of 48 Core fiber optic cable, and 1 km of 12 core fiber optic cable for the Public Authority of Industry, to establish optical fiber links connectivity from Head Quarter (South Surra) to Six of PAI locations i.e Sulaibia , Ardiya, Mina Abdullah, Free Zone, Airport and Fahaheel Area.

DEERNS

Supply, Installation, Commissioning, Providing of Training, Warranty, Maintenance & Technical Support of Document Control System (DCS) at DGCA Planning & Control Dept. and other beneficiary Depts related to Meteorology & Navigational Projects.

  • Document Control System.
  • Networking cabling.
  • Computer room preparation and cablings.
  • Network Management Systems.
  • Cable Management System Specific Training.

Public Authority of Manpower

Supply, installation and maintenance for 40 Km of 12 Core fiber optic cable for the Public Authority of Manpower, connecting 9 PAM facilities to the nearest MOC exchange along with terminating and testing all fiber optic cables.

Phase II is under execution, consisting of installation for 35 KM of 12 Core Fiber optic cable connecting 5 PAM facilities to the nearest MOC exchange along with terminating and testing all fiber optic cables.

Ministry of Communication

ACC- Subcontractor of Huawei and its scope of work as follows:

  • Detailed demand survey and identification of the number of building of houses by vacant plots, under construction.
  • Supply of all civil materials, tools and vehicles to perform all services related to civil works for laying PVC 110 pipes, construction of handholes, manholes, etc to allow pulling subducts, fiber optic cables.
  • Splicing and termination of Fiber Optic Cables inside MOC exchanges and customer home/buildings.
  • Installation of FTTH/GPON components, like splitter cabinets/closures termination box.
  • Conducting the Optical Test measurements (OTDR, OLTS).
  • As-built Documentation in AutoCAD.

Kuwait Ports Authority

A wide range of Sensors System Connectivity for Port Authority including:-


  • Radio Communications & recorders.
  • Maritime Sensors. 
  • Weather Sensors. 
  • Oceanographic Sensors. 
  • Telemetry Network and Unified Sensors Display Application. 
  • Installation in Port Towers, Under sea water and in ships. 
  • Data transfer and communication devices .
  • Communication and information transfer systems.
  • LAN / WAN.

National Bank of Kuwait

Supply and installation fiber optic cable for NBK backbone infrastructure, connecting all NBK branches to HQ.

Scope of work:

  • 60Km of 96Core FOC and required OSP civil works.
  • Network Cabling, Site preparation and Cabling.

Kuwait National Guard

ACC- Subcontractor of Huawei and its scope of work as follows: Implementation of several Application-Suites that are based on SAP, IBM, Microsoft and OpenText platforms, in addition to the migration of legacy data as well as digitization services. Works covers complete a single integration services bus platform across all systems / subsystems as well as with external entities government entities such as Ministry of Health, Civil Service Commission, Public Institute for Social Security, Ministry of Interior, etc...

The List of Applications-Suites includes:

  • SAP Project Management System 
  • SAP IT Service Desk 
  • OpenText Enterprise Content Management (ECM) 
  • OpenText Graphics and image processing software 
  • OpenText Statistical software 
  • OpenText image systems 
  • OpenText Correspondence Management System (CMS) 
  • Electronic corresponded system
  • Medical Information System, Dental System 
  • SAP Planning System (including corporate strategic planning) 
  • SAP Human Resources Management System (HRMS) 
  • SAP Portal, SAP Business Intelligence 
  • Data banks services 
  • Technical support administration system and virtual infrastructure admin system 
  • IBM Maximo Enhancement Services 
  • Specific training, Supportive training.

DGCA

As the Local Agent for Leonardo, the subcontract is signed under the name of FLC, an entity fully owned by ACC (works are fully performed by ACC employees). Scope of work includes site management, field survey, design, installation testing and commissioning under the supervision of Leonardo Engineers of the complete Kuwait Airport Data Interchange Network (KADIN).

Also, the work includes OSP and Civil Works Activities, Project Administration, CMS, Penetration Testing, Application Interfacing HW, Cisco Training Logistics, Network Sync Equipment, Test Equipment, Electrical Telephone Explosion & Weatherproof, Furniture & Console.

Main Scope:

  • Data transfer and communication devices.
  • Communication and information transfer systems.
  • IP-MPLS Core, Edge, and CPE Access Network. 
  • LAN / WAN.
  • Networking cabling.
  • KCMC LAN, Wifi, iPBX, DNS & DHCP servers. 
  • Transition of Airport Applications to the IP-MPLS Network ·Computer room preparation and cablings.
  • Main and Backup Data Centers. 
  • Communications Management Centre and Communications Back Up Centre.
  • Outside Fiber Optic & Civil Work Plant across the Airport and Runways.
  • Inside Fiber Optic & Civil Work Plant for Sites.
  • Network Admin, capacity management and performance monitoring and load follow up.
  • Main & Backup Umbrella Management Centers (NoC).
  • Network Management Systems.
  • Cable Management System. 
  • Information security and privacy. 
  • Security & privacy software.
  • Monitoring and control systems. 
  • Intrusion detection systems. 
  • SNS Block and Security Network System (Firewalls etc.).
  • Power Systems General basic training, Specific training, Supportive training.
Projects Image

Ministry of Defense Kuwait

Secured Alternate Communication Optical Network (SACON) for the Cooperation Council for the Arab States of the Gulf (CCASG) in Kuwait.

arrow
Projects Image

Kuwait Fire Service Directorate

Upgrade, Operation and Maintenance of telecommunication systems and accessories.

arrow
Projects Image

Kuwait Oil Company (KSC)

Passive Optical fiber Network company-wide

arrow

DGCA

The Kuwait Airport Data Interchange Network (KADIN) is designed to be the single unified communications infrastructure at Kuwait International Airport, connecting facilities as required. KADIN comprises an outside infrastructure consisting of manholes, hand holes, duct banks and single mode F.O. cabling, and active equipment forming an IP/MPLS cloud with associated network management and traffic engineering capabilities. KADIN currently serves predominantly Air Traffic Management, Air Navigation and Meteorological systems at Kuwait International airport. The KADIN IP/MPLS cloud has the capability to develop into the intended single communications infrastructure for the airport. The KADIN+ project builds upon the KADIN project at Kuwait International Airport.

Design, Manufacture, Supply, Installation, Commissioning, Providing of Training, Warranty, Maintenance and Technical Support of KADIN Expansion & PABX Integration at Kuwait International Airport (KADIN Plus). The Scope of work undertaken is summarized as follows:.

  • Local Area Networks for the new Air Traffic Control Tower
  • Rationalization of KADIN 
  • Increase of capacity and bandwidth
  • Increase of Functionality 
  • Connection of new facilities. 
  • OSP & Civil works.

Ministry of Interior

The main objective of the Maintenance Support service is to ensure the integrity and proper functioning of all system components by performing the following activities:

  • Performing regular preventive / repair and corrective maintenance which consists of maintenance for Outdoor Fixed cameras, Indoor Fixed Dome cameras, Video Recorder system, Access switches, UPS system, Fiber Patch panels & Electrical DB
  • To prepare all necessary maintenance schedules (PM & CM)
  • Replacing faulty items using spare parts 
  • Providing maintenance support for the staff 
  • Reporting the systems performance to the customer

Kuwait Ports Authority

The system comprises of and implements the following equipments/subsystems and then auxiliary.

ACC has borne complete responsibility of procurement / development of all the above equipment/sub-stems. These responsibilities include installation, commissioning and testing of the complete system including the interfacing of all the equipments. The details of civil works carried out for the total execution are:-

  • Tracking System. 
  • VTMS Computer System.
  • AIS System.
  • VHF System. 
  • CCTV system 
  • Voice recording and replay system. 
  • Communication Link (Microwave Link). 
  • Meteorological sensors.
  • Electrical Power System (including UPS and Generators).
  • Electrical Power System (including UPS and Generators.

Kuwait Fire Force

Turnkey solution including survey, design, delivery, installation, commissioning, training, warranty, and maintenance support for a Microwave communication network and related subsystems to support and extend backhaul operations between KFSD Control Centers and fixed and mobile assets.

The required microwave network integrates with and extends existing network services. The network is based on open digital standards for public safety as a Turnkey solution including all hardware, software, and civil infrastructure components.

Ministry of Defense

CSS and Communications Equipment - Installation, Integration, Configuration, Testing, Commissioning, As-builts, OMSI, Training etc. for the following Sub-systems:

  • CSS Coastal Surveillance System
  • CIP Software Application (CIP - Critical Infrastructure Protection)
  • Tactical Radar System (Antenna, ACU, Transceivers, Waveguides)
  • Long / Short Range Camera
  • Thermal Sensors
  • AIS Base Station Transponder
  • Audio / Video Recording Servers
  • Bridge Consoles
  • METEO Weather Station
  • GMDSS System
  • HF Radios /Maritime VHF
  • Aeronautical VHF/UHF
  • Tetra Radios
  • Multiband Networking Manpack Radio
  • HF Software Defined Radio
  • Wideband HF/VHF Tactical Radio System
  • Radio Base Station
  • IP Advanced Radio System
  • TVRO Solution
  • LAN for Office & Voice Networks
  • Wireless LAN
  • UPS system
  • Aeronautical Non-directional Beacon
  • Radio Dispatching and Recording Systems

DGCA AVIC

The scope consists of connecting the applications interface cables & fiber cables to the KADIN racks/ and connecting the racks to room bus and electrical DB in existing grounded trays.

Kuwait National Guard

The Information security enhancement program contains the following:


Part 1: Cybersecurity solutions and services:

    Products Implementation Requirements:

  • Content security (Email) 
  • Data center security 
  • Identity security(only 802.1x) 
  • Network flow security analysis 
  • Malware protection and sandboxing 
  • DNS security 
  • Security Operations Management 
  • End points security 
  • Threat Intelligence 
  • Layer 4 data encryption solution 
  • Products implementations professional services
  • Managed Detect and Response Services (MDR):

  • 24x7 Security Monitoring Service
  • Incident Response Service
  • Proactive Threat Hunting

Part 2: Project Management and Cybersecurity Consultancy Services;

  • Project Management Professional Services 
  • Cybersecurity Strategy 
  • Detailed Cybersecurity Framework 
  • Maturity Model Assessment 
  • Risk Assessment and Recommendations 
  • IT Consolidated Asset Register 
  • Security Posture Assessment 
  • Incident Response Process Development
  • Security Policy and Procedure
  • ISO 27001 Assessment and Gaps Report
  • ISO 27001 Certification
  • Security Roadmap

DGCA - Intelcan

The sole and primary objective of this Subcontract is to perform the Civil Works required for the installation of the ILS systems (LLZ15R, GP15R, LLZ33L and GP33L) and complete installation of the power infrastructure to energize and earthing the ILS elements. Civil works includes - Concrete foundations for antennas, shelters, Field Test Paths and Test Points, Trenching and Piping, Access Road and Parking Lot.

DGCA - Intelcan

The sole and primary objective of this Subcontract is to connect the ILS systems (LLZ15R, GP15R, LLZ33L and GP33L) to the KADIN system, similar to the KADIN connection of the existing runways in TURN KEY conditions.

Ministry of Interior

The main objective of the Maintenance Support service is to ensure the integrity and proper functioning of all system components through the following activities:

  • Performing regular preventive / repair and corrective maintenance which consists of maintenance for Core switches, Access switches, call manager, Executive Phone, Business Phone, PSTN digital Voice gateway, Unite unified Messaging For 200 users with Enterprise Messaging system for 500 users, Servers, electrical items at Server room, Fire Alarm system, CCTV system, Access control system, UPS system, FOC cables between HQ and border sites, EQ Cabinets, Cabling system & Data points distribution. 
  • Preparing all necessary maintenance schedules (PM & CM)
  • Replacing faulty items using spare parts 
  • Providing maintenance support for the trained staff.
  • Providing maintenance training for the new staff 
  • Reporting the systems performance to the customer.

On-site maintenance support as per the MOI working time and on call 24-hours per day to maintain the system performance.

Public Authority for Industry

Supply, installation and maintenance for 75 Km of 48 Core fiber optic cable, and 1 km of 12 core fiber optic cable for the Public Authority of Industry, to establish optical fiber links connectivity from Head Quarter (South Surra) to Six of PAI locations i.e Sulaibia , Ardiya, Mina Abdullah, Free Zone, Airport and Fahaheel Area.

DEERNS

Supply, Installation, Commissioning, Providing of Training, Warranty, Maintenance & Technical Support of Document Control System (DCS) at DGCA Planning & Control Dept. and other beneficiary Depts related to Meteorology & Navigational Projects.

  • Document Control System.
  • Networking cabling.
  • Computer room preparation and cablings.
  • Network Management Systems.
  • Cable Management System Specific Training.

Public Authority of Manpower

Supply, installation and maintenance for 40 Km of 12 Core fiber optic cable for the Public Authority of Manpower, connecting 9 PAM facilities to the nearest MOC exchange along with terminating and testing all fiber optic cables.

Phase II is under execution, consisting of installation for 35 KM of 12 Core Fiber optic cable connecting 5 PAM facilities to the nearest MOC exchange along with terminating and testing all fiber optic cables.

Ministry of Communication

ACC- Subcontractor of Huawei and its scope of work as follows:

  • Detailed demand survey and identification of the number of building of houses by vacant plots, under construction.
  • Supply of all civil materials, tools and vehicles to perform all services related to civil works for laying PVC 110 pipes, construction of handholes, manholes, etc to allow pulling subducts, fiber optic cables.
  • Splicing and termination of Fiber Optic Cables inside MOC exchanges and customer home/buildings.
  • Installation of FTTH/GPON components, like splitter cabinets/closures termination box.
  • Conducting the Optical Test measurements (OTDR, OLTS).
  • As-built Documentation in AutoCAD.

Kuwait Ports Authority

A wide range of Sensors System Connectivity for Port Authority including:-


  • Radio Communications & recorders.
  • Maritime Sensors. 
  • Weather Sensors. 
  • Oceanographic Sensors. 
  • Telemetry Network and Unified Sensors Display Application. 
  • Installation in Port Towers, Under sea water and in ships. 
  • Data transfer and communication devices .
  • Communication and information transfer systems.
  • LAN / WAN.

National Bank of Kuwait

Supply and installation fiber optic cable for NBK backbone infrastructure, connecting all NBK branches to HQ.

Scope of work:

  • 60Km of 96Core FOC and required OSP civil works.
  • Network Cabling, Site preparation and Cabling.

Kuwait National Guard

ACC- Subcontractor of Huawei and its scope of work as follows: Implementation of several Application-Suites that are based on SAP, IBM, Microsoft and OpenText platforms, in addition to the migration of legacy data as well as digitization services. Works covers complete a single integration services bus platform across all systems / subsystems as well as with external entities government entities such as Ministry of Health, Civil Service Commission, Public Institute for Social Security, Ministry of Interior, etc...

The List of Applications-Suites includes:

  • SAP Project Management System 
  • SAP IT Service Desk 
  • OpenText Enterprise Content Management (ECM) 
  • OpenText Graphics and image processing software 
  • OpenText Statistical software 
  • OpenText image systems 
  • OpenText Correspondence Management System (CMS) 
  • Electronic corresponded system
  • Medical Information System, Dental System 
  • SAP Planning System (including corporate strategic planning) 
  • SAP Human Resources Management System (HRMS) 
  • SAP Portal, SAP Business Intelligence 
  • Data banks services 
  • Technical support administration system and virtual infrastructure admin system 
  • IBM Maximo Enhancement Services 
  • Specific training, Supportive training.

DGCA

As the Local Agent for Leonardo, the subcontract is signed under the name of FLC, an entity fully owned by ACC (works are fully performed by ACC employees). Scope of work includes site management, field survey, design, installation testing and commissioning under the supervision of Leonardo Engineers of the complete Kuwait Airport Data Interchange Network (KADIN).

Also, the work includes OSP and Civil Works Activities, Project Administration, CMS, Penetration Testing, Application Interfacing HW, Cisco Training Logistics, Network Sync Equipment, Test Equipment, Electrical Telephone Explosion & Weatherproof, Furniture & Console.

Main Scope:

  • Data transfer and communication devices.
  • Communication and information transfer systems.
  • IP-MPLS Core, Edge, and CPE Access Network. 
  • LAN / WAN.
  • Networking cabling.
  • KCMC LAN, Wifi, iPBX, DNS & DHCP servers. 
  • Transition of Airport Applications to the IP-MPLS Network ·Computer room preparation and cablings.
  • Main and Backup Data Centers. 
  • Communications Management Centre and Communications Back Up Centre.
  • Outside Fiber Optic & Civil Work Plant across the Airport and Runways.
  • Inside Fiber Optic & Civil Work Plant for Sites.
  • Network Admin, capacity management and performance monitoring and load follow up.
  • Main & Backup Umbrella Management Centers (NoC).
  • Network Management Systems.
  • Cable Management System. 
  • Information security and privacy. 
  • Security & privacy software.
  • Monitoring and control systems. 
  • Intrusion detection systems. 
  • SNS Block and Security Network System (Firewalls etc.).
  • Power Systems General basic training, Specific training, Supportive training.

Ministry of Defense Kuwait

ACC- Subcontractor of Huawei and its scope of work as follows: Implementation of the OSP portion of the Secured Alternate Communication Optical Network (SACON) for the Cooperation Council for the Arab States of the Gulf (CCASG) in Kuwait.

Scope of work:

  • 350Km of OSP Infrastructure within Kuwait area.
  • Network Cabling.
  • Site preparation and Cabling.

Kuwait Fire Service Directorate

Upgrade of the network included optimization of the entire Radio Network, GMDSS & Radars for the Sea Rescue stations, IP-PBX for the operation centers and fire stations, new Dispatches solution for the Operation Centers, Accident Management & Reporting solution for the Center and the Fire Stations, and audio loggers.

Upgrade of the KFSD Radio Network and various services including: Support for the Radio Communications Systems (two Centers, 6 Repeaters, 40 Fire Stations, and Over 500 Mobile & Handheld Radios), PBX, IPPBX, GMDSS, Radars, Sonars, Sounders, Weather Stations, Display, PBX Systems, Fiber Optic Systems, Recording Systems, Network Monitoring Systems, Networking Equipment, Unix & NT Servers, Touch Screens Dispatch System, Maximo & Oracle Maintenance and Data Entry Systems, Towers.

  • Data transfer and communication devices.
  • Communication and information transfer systems.
  • LAN / WAN.
  • Networking cabling.
  • Computer room preparation and cablings.
  • Monitoring and control systems.
  • General basic training, Specific training, Supportive training.

Kuwait Oil Company (KSC)

Supply and installation of fiber optic cable, construction of duct system over 2000km comprising Manholes / Handholes with DWC HDPE ducts and HDPE sub-ducts laid in one of the ducts.

Scope of work:

  • 1000km of 48Core Fiber optic cable laid by cable blowing technique, connecting more than 90 buildings to KOC Main.
  • Network Cabling.
  • Site preparation and Cabling.
Projects Image

Ministry Of Interior

Integrated project to upgrade MOI infrastructure for Data Communication and Internet Lines to optimize all new E-government applications.

arrow
Projects Image

Kuwait Danish Dairy Company

LAN & Campus WAN

arrow
Projects Image

Ministry of Information

Supply, installation, testing and training, maintenance and operation and reception of fiber-optic network to transmit radio and television programs.

arrow

DGCA

The Kuwait Airport Data Interchange Network (KADIN) is designed to be the single unified communications infrastructure at Kuwait International Airport, connecting facilities as required. KADIN comprises an outside infrastructure consisting of manholes, hand holes, duct banks and single mode F.O. cabling, and active equipment forming an IP/MPLS cloud with associated network management and traffic engineering capabilities. KADIN currently serves predominantly Air Traffic Management, Air Navigation and Meteorological systems at Kuwait International airport. The KADIN IP/MPLS cloud has the capability to develop into the intended single communications infrastructure for the airport. The KADIN+ project builds upon the KADIN project at Kuwait International Airport.

Design, Manufacture, Supply, Installation, Commissioning, Providing of Training, Warranty, Maintenance and Technical Support of KADIN Expansion & PABX Integration at Kuwait International Airport (KADIN Plus). The Scope of work undertaken is summarized as follows:.

  • Local Area Networks for the new Air Traffic Control Tower
  • Rationalization of KADIN 
  • Increase of capacity and bandwidth
  • Increase of Functionality 
  • Connection of new facilities. 
  • OSP & Civil works.

Ministry of Interior

The main objective of the Maintenance Support service is to ensure the integrity and proper functioning of all system components by performing the following activities:

  • Performing regular preventive / repair and corrective maintenance which consists of maintenance for Outdoor Fixed cameras, Indoor Fixed Dome cameras, Video Recorder system, Access switches, UPS system, Fiber Patch panels & Electrical DB
  • To prepare all necessary maintenance schedules (PM & CM)
  • Replacing faulty items using spare parts 
  • Providing maintenance support for the staff 
  • Reporting the systems performance to the customer

Kuwait Ports Authority

The system comprises of and implements the following equipments/subsystems and then auxiliary.

ACC has borne complete responsibility of procurement / development of all the above equipment/sub-stems. These responsibilities include installation, commissioning and testing of the complete system including the interfacing of all the equipments. The details of civil works carried out for the total execution are:-

  • Tracking System. 
  • VTMS Computer System.
  • AIS System.
  • VHF System. 
  • CCTV system 
  • Voice recording and replay system. 
  • Communication Link (Microwave Link). 
  • Meteorological sensors.
  • Electrical Power System (including UPS and Generators).
  • Electrical Power System (including UPS and Generators.

Kuwait Fire Force

Turnkey solution including survey, design, delivery, installation, commissioning, training, warranty, and maintenance support for a Microwave communication network and related subsystems to support and extend backhaul operations between KFSD Control Centers and fixed and mobile assets.

The required microwave network integrates with and extends existing network services. The network is based on open digital standards for public safety as a Turnkey solution including all hardware, software, and civil infrastructure components.

Ministry of Defense

CSS and Communications Equipment - Installation, Integration, Configuration, Testing, Commissioning, As-builts, OMSI, Training etc. for the following Sub-systems:

  • CSS Coastal Surveillance System
  • CIP Software Application (CIP - Critical Infrastructure Protection)
  • Tactical Radar System (Antenna, ACU, Transceivers, Waveguides)
  • Long / Short Range Camera
  • Thermal Sensors
  • AIS Base Station Transponder
  • Audio / Video Recording Servers
  • Bridge Consoles
  • METEO Weather Station
  • GMDSS System
  • HF Radios /Maritime VHF
  • Aeronautical VHF/UHF
  • Tetra Radios
  • Multiband Networking Manpack Radio
  • HF Software Defined Radio
  • Wideband HF/VHF Tactical Radio System
  • Radio Base Station
  • IP Advanced Radio System
  • TVRO Solution
  • LAN for Office & Voice Networks
  • Wireless LAN
  • UPS system
  • Aeronautical Non-directional Beacon
  • Radio Dispatching and Recording Systems

DGCA AVIC

The scope consists of connecting the applications interface cables & fiber cables to the KADIN racks/ and connecting the racks to room bus and electrical DB in existing grounded trays.

Kuwait National Guard

The Information security enhancement program contains the following:


Part 1: Cybersecurity solutions and services:

    Products Implementation Requirements:

  • Content security (Email) 
  • Data center security 
  • Identity security(only 802.1x) 
  • Network flow security analysis 
  • Malware protection and sandboxing 
  • DNS security 
  • Security Operations Management 
  • End points security 
  • Threat Intelligence 
  • Layer 4 data encryption solution 
  • Products implementations professional services
  • Managed Detect and Response Services (MDR):

  • 24x7 Security Monitoring Service
  • Incident Response Service
  • Proactive Threat Hunting

Part 2: Project Management and Cybersecurity Consultancy Services;

  • Project Management Professional Services 
  • Cybersecurity Strategy 
  • Detailed Cybersecurity Framework 
  • Maturity Model Assessment 
  • Risk Assessment and Recommendations 
  • IT Consolidated Asset Register 
  • Security Posture Assessment 
  • Incident Response Process Development
  • Security Policy and Procedure
  • ISO 27001 Assessment and Gaps Report
  • ISO 27001 Certification
  • Security Roadmap

DGCA - Intelcan

The sole and primary objective of this Subcontract is to perform the Civil Works required for the installation of the ILS systems (LLZ15R, GP15R, LLZ33L and GP33L) and complete installation of the power infrastructure to energize and earthing the ILS elements. Civil works includes - Concrete foundations for antennas, shelters, Field Test Paths and Test Points, Trenching and Piping, Access Road and Parking Lot.

DGCA - Intelcan

The sole and primary objective of this Subcontract is to connect the ILS systems (LLZ15R, GP15R, LLZ33L and GP33L) to the KADIN system, similar to the KADIN connection of the existing runways in TURN KEY conditions.

Ministry of Interior

The main objective of the Maintenance Support service is to ensure the integrity and proper functioning of all system components through the following activities:

  • Performing regular preventive / repair and corrective maintenance which consists of maintenance for Core switches, Access switches, call manager, Executive Phone, Business Phone, PSTN digital Voice gateway, Unite unified Messaging For 200 users with Enterprise Messaging system for 500 users, Servers, electrical items at Server room, Fire Alarm system, CCTV system, Access control system, UPS system, FOC cables between HQ and border sites, EQ Cabinets, Cabling system & Data points distribution. 
  • Preparing all necessary maintenance schedules (PM & CM)
  • Replacing faulty items using spare parts 
  • Providing maintenance support for the trained staff.
  • Providing maintenance training for the new staff 
  • Reporting the systems performance to the customer.

On-site maintenance support as per the MOI working time and on call 24-hours per day to maintain the system performance.

Public Authority for Industry

Supply, installation and maintenance for 75 Km of 48 Core fiber optic cable, and 1 km of 12 core fiber optic cable for the Public Authority of Industry, to establish optical fiber links connectivity from Head Quarter (South Surra) to Six of PAI locations i.e Sulaibia , Ardiya, Mina Abdullah, Free Zone, Airport and Fahaheel Area.

DEERNS

Supply, Installation, Commissioning, Providing of Training, Warranty, Maintenance & Technical Support of Document Control System (DCS) at DGCA Planning & Control Dept. and other beneficiary Depts related to Meteorology & Navigational Projects.

  • Document Control System.
  • Networking cabling.
  • Computer room preparation and cablings.
  • Network Management Systems.
  • Cable Management System Specific Training.

Public Authority of Manpower

Supply, installation and maintenance for 40 Km of 12 Core fiber optic cable for the Public Authority of Manpower, connecting 9 PAM facilities to the nearest MOC exchange along with terminating and testing all fiber optic cables.

Phase II is under execution, consisting of installation for 35 KM of 12 Core Fiber optic cable connecting 5 PAM facilities to the nearest MOC exchange along with terminating and testing all fiber optic cables.

Ministry of Communication

ACC- Subcontractor of Huawei and its scope of work as follows:

  • Detailed demand survey and identification of the number of building of houses by vacant plots, under construction.
  • Supply of all civil materials, tools and vehicles to perform all services related to civil works for laying PVC 110 pipes, construction of handholes, manholes, etc to allow pulling subducts, fiber optic cables.
  • Splicing and termination of Fiber Optic Cables inside MOC exchanges and customer home/buildings.
  • Installation of FTTH/GPON components, like splitter cabinets/closures termination box.
  • Conducting the Optical Test measurements (OTDR, OLTS).
  • As-built Documentation in AutoCAD.

Kuwait Ports Authority

A wide range of Sensors System Connectivity for Port Authority including:-


  • Radio Communications & recorders.
  • Maritime Sensors. 
  • Weather Sensors. 
  • Oceanographic Sensors. 
  • Telemetry Network and Unified Sensors Display Application. 
  • Installation in Port Towers, Under sea water and in ships. 
  • Data transfer and communication devices .
  • Communication and information transfer systems.
  • LAN / WAN.

National Bank of Kuwait

Supply and installation fiber optic cable for NBK backbone infrastructure, connecting all NBK branches to HQ.

Scope of work:

  • 60Km of 96Core FOC and required OSP civil works.
  • Network Cabling, Site preparation and Cabling.

Kuwait National Guard

ACC- Subcontractor of Huawei and its scope of work as follows: Implementation of several Application-Suites that are based on SAP, IBM, Microsoft and OpenText platforms, in addition to the migration of legacy data as well as digitization services. Works covers complete a single integration services bus platform across all systems / subsystems as well as with external entities government entities such as Ministry of Health, Civil Service Commission, Public Institute for Social Security, Ministry of Interior, etc...

The List of Applications-Suites includes:

  • SAP Project Management System 
  • SAP IT Service Desk 
  • OpenText Enterprise Content Management (ECM) 
  • OpenText Graphics and image processing software 
  • OpenText Statistical software 
  • OpenText image systems 
  • OpenText Correspondence Management System (CMS) 
  • Electronic corresponded system
  • Medical Information System, Dental System 
  • SAP Planning System (including corporate strategic planning) 
  • SAP Human Resources Management System (HRMS) 
  • SAP Portal, SAP Business Intelligence 
  • Data banks services 
  • Technical support administration system and virtual infrastructure admin system 
  • IBM Maximo Enhancement Services 
  • Specific training, Supportive training.

DGCA

As the Local Agent for Leonardo, the subcontract is signed under the name of FLC, an entity fully owned by ACC (works are fully performed by ACC employees). Scope of work includes site management, field survey, design, installation testing and commissioning under the supervision of Leonardo Engineers of the complete Kuwait Airport Data Interchange Network (KADIN).

Also, the work includes OSP and Civil Works Activities, Project Administration, CMS, Penetration Testing, Application Interfacing HW, Cisco Training Logistics, Network Sync Equipment, Test Equipment, Electrical Telephone Explosion & Weatherproof, Furniture & Console.

Main Scope:

  • Data transfer and communication devices.
  • Communication and information transfer systems.
  • IP-MPLS Core, Edge, and CPE Access Network. 
  • LAN / WAN.
  • Networking cabling.
  • KCMC LAN, Wifi, iPBX, DNS & DHCP servers. 
  • Transition of Airport Applications to the IP-MPLS Network ·Computer room preparation and cablings.
  • Main and Backup Data Centers. 
  • Communications Management Centre and Communications Back Up Centre.
  • Outside Fiber Optic & Civil Work Plant across the Airport and Runways.
  • Inside Fiber Optic & Civil Work Plant for Sites.
  • Network Admin, capacity management and performance monitoring and load follow up.
  • Main & Backup Umbrella Management Centers (NoC).
  • Network Management Systems.
  • Cable Management System. 
  • Information security and privacy. 
  • Security & privacy software.
  • Monitoring and control systems. 
  • Intrusion detection systems. 
  • SNS Block and Security Network System (Firewalls etc.).
  • Power Systems General basic training, Specific training, Supportive training.

Ministry of Defense Kuwait

ACC- Subcontractor of Huawei and its scope of work as follows: Implementation of the OSP portion of the Secured Alternate Communication Optical Network (SACON) for the Cooperation Council for the Arab States of the Gulf (CCASG) in Kuwait.

Scope of work:

  • 350Km of OSP Infrastructure within Kuwait area.
  • Network Cabling.
  • Site preparation and Cabling.

Kuwait Fire Service Directorate

Upgrade of the network included optimization of the entire Radio Network, GMDSS & Radars for the Sea Rescue stations, IP-PBX for the operation centers and fire stations, new Dispatches solution for the Operation Centers, Accident Management & Reporting solution for the Center and the Fire Stations, and audio loggers.

Upgrade of the KFSD Radio Network and various services including: Support for the Radio Communications Systems (two Centers, 6 Repeaters, 40 Fire Stations, and Over 500 Mobile & Handheld Radios), PBX, IPPBX, GMDSS, Radars, Sonars, Sounders, Weather Stations, Display, PBX Systems, Fiber Optic Systems, Recording Systems, Network Monitoring Systems, Networking Equipment, Unix & NT Servers, Touch Screens Dispatch System, Maximo & Oracle Maintenance and Data Entry Systems, Towers.

  • Data transfer and communication devices.
  • Communication and information transfer systems.
  • LAN / WAN.
  • Networking cabling.
  • Computer room preparation and cablings.
  • Monitoring and control systems.
  • General basic training, Specific training, Supportive training.

Kuwait Oil Company (KSC)

Supply and installation of fiber optic cable, construction of duct system over 2000km comprising Manholes / Handholes with DWC HDPE ducts and HDPE sub-ducts laid in one of the ducts.

Scope of work:

  • 1000km of 48Core Fiber optic cable laid by cable blowing technique, connecting more than 90 buildings to KOC Main.
  • Network Cabling.
  • Site preparation and Cabling.

Ministry Of Interior

NW & OSP Infrastructure - Cisco (Core switches, routers, Access switches).

  • Supply and installation of Fiber cables connecting MOI to MOC Exchanges.
  • Connecting fiber cables in the specified exchanges with the ISP cabinet in those exchanges with all needed patches and connections.
  • All the connections and terminations with the ISP managing MOI.
  • Supply, installation and configuration of Cisco equipment.
  • Data transfer and communication devices.
  • Communication and information transfer systems.
  • LAN / WAN.

Kuwait Danish Dairy Company

Turnkey Project Campus Network including:

  • 29 GE Edge Switches
  • Two fully redundant Cisco 6500 Core Switches
  • Connect Server Farm & Users
  • Cisco Works Network Management System
  • Laying Fiber and UTP Cables
  • Servers, PC, Handhelds, UPS’s, Disaster Recovery and Backup services

Complete Data Center Services:

  • Oracle EBusiness Suite
  • Financials, SCM, OPM, HRMS
  • Maximo EAM
  • Maintenance & Material Management, and IT Service Management
  • Documentum (On-going)
  • Document Management Services, File-shares, AutoCAD Integration
  • Integration Services across the ERP suites
  • Cisco Data Network
  • Complete Campus Infrastructure: wireless, fiber, radio
  • HP & IBM Computer
  • Hardware Servers, Workstations, and peripherals
  • DAP & Symbol/Motorola Handheld Computers and peripherals
  • Large Scale Power Protection Services
  • Data transfer and communication devices
  • Communication and information transfer systems
  • LAN / WAN
  • Monitoring and control systems

Ministry of Information

  • 155 Ch. Monitoring & Archive System for Sat. TV, Earth TV, DBV-T, DAB, FM/AM Broadcast
  • Digital Audio Broadcast (DAB)
  • SDH Fiber Network connecting FM, AM, TV Broadcast Studios to Broadcast Stations
  • Logger/Archive System post Broadcast Studios and past transmission over fiber SDH & into Broadcast Stations.
  • SDH FOC System Link to MOC and GCC over the FOG for carrying Live Feeds between GCC countries.
  • SDH FOC System Link to MOC and GCC over the FOG for carrying Live Feeds between GCC countries.
  • Broadcast Monitoring, Direction Finding, & Measurement Vehicle.
  • Satellite News Gathering Vehicle (SNG).
  • Mobile Radio Broadcast Monitoring Station.
  • Various Maintenance Project.
  • Data transfer and communication devices.
  • Communication and information transfer systems, LAN / WAN.
Projects Image

Ministry of Communication

MOC CDMA WLL

arrow
Projects Image

Kuwait Oil Company

eBusiness & Enterprise Asset Management System Implementation, Training & Support

arrow
Projects Image

National Bank Of Kuwait

Point to Point Broadband Microwave Network

arrow

DGCA

The Kuwait Airport Data Interchange Network (KADIN) is designed to be the single unified communications infrastructure at Kuwait International Airport, connecting facilities as required. KADIN comprises an outside infrastructure consisting of manholes, hand holes, duct banks and single mode F.O. cabling, and active equipment forming an IP/MPLS cloud with associated network management and traffic engineering capabilities. KADIN currently serves predominantly Air Traffic Management, Air Navigation and Meteorological systems at Kuwait International airport. The KADIN IP/MPLS cloud has the capability to develop into the intended single communications infrastructure for the airport. The KADIN+ project builds upon the KADIN project at Kuwait International Airport.

Design, Manufacture, Supply, Installation, Commissioning, Providing of Training, Warranty, Maintenance and Technical Support of KADIN Expansion & PABX Integration at Kuwait International Airport (KADIN Plus). The Scope of work undertaken is summarized as follows:.

  • Local Area Networks for the new Air Traffic Control Tower
  • Rationalization of KADIN 
  • Increase of capacity and bandwidth
  • Increase of Functionality 
  • Connection of new facilities. 
  • OSP & Civil works.

Ministry of Interior

The main objective of the Maintenance Support service is to ensure the integrity and proper functioning of all system components by performing the following activities:

  • Performing regular preventive / repair and corrective maintenance which consists of maintenance for Outdoor Fixed cameras, Indoor Fixed Dome cameras, Video Recorder system, Access switches, UPS system, Fiber Patch panels & Electrical DB
  • To prepare all necessary maintenance schedules (PM & CM)
  • Replacing faulty items using spare parts 
  • Providing maintenance support for the staff 
  • Reporting the systems performance to the customer

Kuwait Ports Authority

The system comprises of and implements the following equipments/subsystems and then auxiliary.

ACC has borne complete responsibility of procurement / development of all the above equipment/sub-stems. These responsibilities include installation, commissioning and testing of the complete system including the interfacing of all the equipments. The details of civil works carried out for the total execution are:-

  • Tracking System. 
  • VTMS Computer System.
  • AIS System.
  • VHF System. 
  • CCTV system 
  • Voice recording and replay system. 
  • Communication Link (Microwave Link). 
  • Meteorological sensors.
  • Electrical Power System (including UPS and Generators).
  • Electrical Power System (including UPS and Generators.

Kuwait Fire Force

Turnkey solution including survey, design, delivery, installation, commissioning, training, warranty, and maintenance support for a Microwave communication network and related subsystems to support and extend backhaul operations between KFSD Control Centers and fixed and mobile assets.

The required microwave network integrates with and extends existing network services. The network is based on open digital standards for public safety as a Turnkey solution including all hardware, software, and civil infrastructure components.

Ministry of Defense

CSS and Communications Equipment - Installation, Integration, Configuration, Testing, Commissioning, As-builts, OMSI, Training etc. for the following Sub-systems:

  • CSS Coastal Surveillance System
  • CIP Software Application (CIP - Critical Infrastructure Protection)
  • Tactical Radar System (Antenna, ACU, Transceivers, Waveguides)
  • Long / Short Range Camera
  • Thermal Sensors
  • AIS Base Station Transponder
  • Audio / Video Recording Servers
  • Bridge Consoles
  • METEO Weather Station
  • GMDSS System
  • HF Radios /Maritime VHF
  • Aeronautical VHF/UHF
  • Tetra Radios
  • Multiband Networking Manpack Radio
  • HF Software Defined Radio
  • Wideband HF/VHF Tactical Radio System
  • Radio Base Station
  • IP Advanced Radio System
  • TVRO Solution
  • LAN for Office & Voice Networks
  • Wireless LAN
  • UPS system
  • Aeronautical Non-directional Beacon
  • Radio Dispatching and Recording Systems

DGCA AVIC

The scope consists of connecting the applications interface cables & fiber cables to the KADIN racks/ and connecting the racks to room bus and electrical DB in existing grounded trays.

Kuwait National Guard

The Information security enhancement program contains the following:


Part 1: Cybersecurity solutions and services:

    Products Implementation Requirements:

  • Content security (Email) 
  • Data center security 
  • Identity security(only 802.1x) 
  • Network flow security analysis 
  • Malware protection and sandboxing 
  • DNS security 
  • Security Operations Management 
  • End points security 
  • Threat Intelligence 
  • Layer 4 data encryption solution 
  • Products implementations professional services
  • Managed Detect and Response Services (MDR):

  • 24x7 Security Monitoring Service
  • Incident Response Service
  • Proactive Threat Hunting

Part 2: Project Management and Cybersecurity Consultancy Services;

  • Project Management Professional Services 
  • Cybersecurity Strategy 
  • Detailed Cybersecurity Framework 
  • Maturity Model Assessment 
  • Risk Assessment and Recommendations 
  • IT Consolidated Asset Register 
  • Security Posture Assessment 
  • Incident Response Process Development
  • Security Policy and Procedure
  • ISO 27001 Assessment and Gaps Report
  • ISO 27001 Certification
  • Security Roadmap

DGCA - Intelcan

The sole and primary objective of this Subcontract is to perform the Civil Works required for the installation of the ILS systems (LLZ15R, GP15R, LLZ33L and GP33L) and complete installation of the power infrastructure to energize and earthing the ILS elements. Civil works includes - Concrete foundations for antennas, shelters, Field Test Paths and Test Points, Trenching and Piping, Access Road and Parking Lot.

DGCA - Intelcan

The sole and primary objective of this Subcontract is to connect the ILS systems (LLZ15R, GP15R, LLZ33L and GP33L) to the KADIN system, similar to the KADIN connection of the existing runways in TURN KEY conditions.

Ministry of Interior

The main objective of the Maintenance Support service is to ensure the integrity and proper functioning of all system components through the following activities:

  • Performing regular preventive / repair and corrective maintenance which consists of maintenance for Core switches, Access switches, call manager, Executive Phone, Business Phone, PSTN digital Voice gateway, Unite unified Messaging For 200 users with Enterprise Messaging system for 500 users, Servers, electrical items at Server room, Fire Alarm system, CCTV system, Access control system, UPS system, FOC cables between HQ and border sites, EQ Cabinets, Cabling system & Data points distribution. 
  • Preparing all necessary maintenance schedules (PM & CM)
  • Replacing faulty items using spare parts 
  • Providing maintenance support for the trained staff.
  • Providing maintenance training for the new staff 
  • Reporting the systems performance to the customer.

On-site maintenance support as per the MOI working time and on call 24-hours per day to maintain the system performance.

Public Authority for Industry

Supply, installation and maintenance for 75 Km of 48 Core fiber optic cable, and 1 km of 12 core fiber optic cable for the Public Authority of Industry, to establish optical fiber links connectivity from Head Quarter (South Surra) to Six of PAI locations i.e Sulaibia , Ardiya, Mina Abdullah, Free Zone, Airport and Fahaheel Area.

DEERNS

Supply, Installation, Commissioning, Providing of Training, Warranty, Maintenance & Technical Support of Document Control System (DCS) at DGCA Planning & Control Dept. and other beneficiary Depts related to Meteorology & Navigational Projects.

  • Document Control System.
  • Networking cabling.
  • Computer room preparation and cablings.
  • Network Management Systems.
  • Cable Management System Specific Training.

Public Authority of Manpower

Supply, installation and maintenance for 40 Km of 12 Core fiber optic cable for the Public Authority of Manpower, connecting 9 PAM facilities to the nearest MOC exchange along with terminating and testing all fiber optic cables.

Phase II is under execution, consisting of installation for 35 KM of 12 Core Fiber optic cable connecting 5 PAM facilities to the nearest MOC exchange along with terminating and testing all fiber optic cables.

Ministry of Communication

ACC- Subcontractor of Huawei and its scope of work as follows:

  • Detailed demand survey and identification of the number of building of houses by vacant plots, under construction.
  • Supply of all civil materials, tools and vehicles to perform all services related to civil works for laying PVC 110 pipes, construction of handholes, manholes, etc to allow pulling subducts, fiber optic cables.
  • Splicing and termination of Fiber Optic Cables inside MOC exchanges and customer home/buildings.
  • Installation of FTTH/GPON components, like splitter cabinets/closures termination box.
  • Conducting the Optical Test measurements (OTDR, OLTS).
  • As-built Documentation in AutoCAD.

Kuwait Ports Authority

A wide range of Sensors System Connectivity for Port Authority including:-


  • Radio Communications & recorders.
  • Maritime Sensors. 
  • Weather Sensors. 
  • Oceanographic Sensors. 
  • Telemetry Network and Unified Sensors Display Application. 
  • Installation in Port Towers, Under sea water and in ships. 
  • Data transfer and communication devices .
  • Communication and information transfer systems.
  • LAN / WAN.

National Bank of Kuwait

Supply and installation fiber optic cable for NBK backbone infrastructure, connecting all NBK branches to HQ.

Scope of work:

  • 60Km of 96Core FOC and required OSP civil works.
  • Network Cabling, Site preparation and Cabling.

Kuwait National Guard

ACC- Subcontractor of Huawei and its scope of work as follows: Implementation of several Application-Suites that are based on SAP, IBM, Microsoft and OpenText platforms, in addition to the migration of legacy data as well as digitization services. Works covers complete a single integration services bus platform across all systems / subsystems as well as with external entities government entities such as Ministry of Health, Civil Service Commission, Public Institute for Social Security, Ministry of Interior, etc...

The List of Applications-Suites includes:

  • SAP Project Management System 
  • SAP IT Service Desk 
  • OpenText Enterprise Content Management (ECM) 
  • OpenText Graphics and image processing software 
  • OpenText Statistical software 
  • OpenText image systems 
  • OpenText Correspondence Management System (CMS) 
  • Electronic corresponded system
  • Medical Information System, Dental System 
  • SAP Planning System (including corporate strategic planning) 
  • SAP Human Resources Management System (HRMS) 
  • SAP Portal, SAP Business Intelligence 
  • Data banks services 
  • Technical support administration system and virtual infrastructure admin system 
  • IBM Maximo Enhancement Services 
  • Specific training, Supportive training.

DGCA

As the Local Agent for Leonardo, the subcontract is signed under the name of FLC, an entity fully owned by ACC (works are fully performed by ACC employees). Scope of work includes site management, field survey, design, installation testing and commissioning under the supervision of Leonardo Engineers of the complete Kuwait Airport Data Interchange Network (KADIN).

Also, the work includes OSP and Civil Works Activities, Project Administration, CMS, Penetration Testing, Application Interfacing HW, Cisco Training Logistics, Network Sync Equipment, Test Equipment, Electrical Telephone Explosion & Weatherproof, Furniture & Console.

Main Scope:

  • Data transfer and communication devices.
  • Communication and information transfer systems.
  • IP-MPLS Core, Edge, and CPE Access Network. 
  • LAN / WAN.
  • Networking cabling.
  • KCMC LAN, Wifi, iPBX, DNS & DHCP servers. 
  • Transition of Airport Applications to the IP-MPLS Network ·Computer room preparation and cablings.
  • Main and Backup Data Centers. 
  • Communications Management Centre and Communications Back Up Centre.
  • Outside Fiber Optic & Civil Work Plant across the Airport and Runways.
  • Inside Fiber Optic & Civil Work Plant for Sites.
  • Network Admin, capacity management and performance monitoring and load follow up.
  • Main & Backup Umbrella Management Centers (NoC).
  • Network Management Systems.
  • Cable Management System. 
  • Information security and privacy. 
  • Security & privacy software.
  • Monitoring and control systems. 
  • Intrusion detection systems. 
  • SNS Block and Security Network System (Firewalls etc.).
  • Power Systems General basic training, Specific training, Supportive training.

Ministry of Defense Kuwait

ACC- Subcontractor of Huawei and its scope of work as follows: Implementation of the OSP portion of the Secured Alternate Communication Optical Network (SACON) for the Cooperation Council for the Arab States of the Gulf (CCASG) in Kuwait.

Scope of work:

  • 350Km of OSP Infrastructure within Kuwait area.
  • Network Cabling.
  • Site preparation and Cabling.

Kuwait Fire Service Directorate

Upgrade of the network included optimization of the entire Radio Network, GMDSS & Radars for the Sea Rescue stations, IP-PBX for the operation centers and fire stations, new Dispatches solution for the Operation Centers, Accident Management & Reporting solution for the Center and the Fire Stations, and audio loggers.

Upgrade of the KFSD Radio Network and various services including: Support for the Radio Communications Systems (two Centers, 6 Repeaters, 40 Fire Stations, and Over 500 Mobile & Handheld Radios), PBX, IPPBX, GMDSS, Radars, Sonars, Sounders, Weather Stations, Display, PBX Systems, Fiber Optic Systems, Recording Systems, Network Monitoring Systems, Networking Equipment, Unix & NT Servers, Touch Screens Dispatch System, Maximo & Oracle Maintenance and Data Entry Systems, Towers.

  • Data transfer and communication devices.
  • Communication and information transfer systems.
  • LAN / WAN.
  • Networking cabling.
  • Computer room preparation and cablings.
  • Monitoring and control systems.
  • General basic training, Specific training, Supportive training.

Kuwait Oil Company (KSC)

Supply and installation of fiber optic cable, construction of duct system over 2000km comprising Manholes / Handholes with DWC HDPE ducts and HDPE sub-ducts laid in one of the ducts.

Scope of work:

  • 1000km of 48Core Fiber optic cable laid by cable blowing technique, connecting more than 90 buildings to KOC Main.
  • Network Cabling.
  • Site preparation and Cabling.

Ministry Of Interior

NW & OSP Infrastructure - Cisco (Core switches, routers, Access switches).

  • Supply and installation of Fiber cables connecting MOI to MOC Exchanges.
  • Connecting fiber cables in the specified exchanges with the ISP cabinet in those exchanges with all needed patches and connections.
  • All the connections and terminations with the ISP managing MOI.
  • Supply, installation and configuration of Cisco equipment.
  • Data transfer and communication devices.
  • Communication and information transfer systems.
  • LAN / WAN.

Kuwait Danish Dairy Company

Turnkey Project Campus Network including:

  • 29 GE Edge Switches
  • Two fully redundant Cisco 6500 Core Switches
  • Connect Server Farm & Users
  • Cisco Works Network Management System
  • Laying Fiber and UTP Cables
  • Servers, PC, Handhelds, UPS’s, Disaster Recovery and Backup services

Complete Data Center Services:

  • Oracle EBusiness Suite
  • Financials, SCM, OPM, HRMS
  • Maximo EAM
  • Maintenance & Material Management, and IT Service Management
  • Documentum (On-going)
  • Document Management Services, File-shares, AutoCAD Integration
  • Integration Services across the ERP suites
  • Cisco Data Network
  • Complete Campus Infrastructure: wireless, fiber, radio
  • HP & IBM Computer
  • Hardware Servers, Workstations, and peripherals
  • DAP & Symbol/Motorola Handheld Computers and peripherals
  • Large Scale Power Protection Services
  • Data transfer and communication devices
  • Communication and information transfer systems
  • LAN / WAN
  • Monitoring and control systems

Ministry of Information

  • 155 Ch. Monitoring & Archive System for Sat. TV, Earth TV, DBV-T, DAB, FM/AM Broadcast
  • Digital Audio Broadcast (DAB)
  • SDH Fiber Network connecting FM, AM, TV Broadcast Studios to Broadcast Stations
  • Logger/Archive System post Broadcast Studios and past transmission over fiber SDH & into Broadcast Stations.
  • SDH FOC System Link to MOC and GCC over the FOG for carrying Live Feeds between GCC countries.
  • SDH FOC System Link to MOC and GCC over the FOG for carrying Live Feeds between GCC countries.
  • Broadcast Monitoring, Direction Finding, & Measurement Vehicle.
  • Satellite News Gathering Vehicle (SNG).
  • Mobile Radio Broadcast Monitoring Station.
  • Various Maintenance Project.
  • Data transfer and communication devices.
  • Communication and information transfer systems, LAN / WAN.

Ministry of Communication

Supply, installation, testing and operation and maintenance of the wireless phone system (WLL) for 20 Thousand lines.

  • Turnkey Integrated System
  • Operation & Maintenance
  • Fixed and mobile cellular
  • 20,000 Telephone Lines
  • 99.5% coverage for 10 areas
  • Connect with all MoC exchanges
  • Fiber & Microwave Transmission
  • Tower & Shelters
  • Connect with MoC Auto Disconnect
  • First commercial CDMA in the MEA
  • Data transfer and communication devices
  • Communication and information transfer systems
  • LAN / WAN

Kuwait Oil Company

The Scope of Work primarily handled the replacement of the Indus Passport System with IBM Maximo Enterprise Asset Management and the implementation of e-Business.

Implementation covered the following:

  • Management of Maintenance
  • Materials
  • Contracts
  • Data repositories for Assets Hierarchy
  • Labor records
  • Job Plans
  • Inventory Items
  • Contracts line items
  • Specific industry for IT Service Management
  • Transportation
  • Scheduling, Calibration
  • GIS
  • Linear, and Oil and Gas
  • Data Cleansing, Data Collection
  • Data Management exercise catering for Inventory Items Cataloguing, Purchasing Contracts Data Cleansing, Assets Data Cleansing
  • Software solutions (sites, portals, e-services, content management), etc.

The Implementation phase of the project was completed at the end of 2010. The eBEAMS project went Live on 9 January, 2011 and the maintenance support phase went live from August 2011. The contract period ended in 2015.

National Bank Of Kuwait

Turnkey Integrated Project for NBK

  • Design, Delivery, Commissioning of a Broadband Microwave Network
  • Link all Branches to the HQ Data Center
  • Link over 70 NBK centers
  • Dual Fiber Ring over HQ and Kuwait towers
  • Connects Edge to Core Cisco Switches and Routers
  • Eliminates dependence on Service providers
  • 24/7/2 Maintenance Support
  • Continual upgrading and adding of new branches
  • Data transfer and communication devices
  • Communication and information transfer systems
  • LAN / WAN
Projects Image

Kuwait National Petroleum Company (KSC)

Kuwait Integrated Management System KIMS

arrow
Projects Image

Kuwait National Guard

Integrated Logistics Support Services Project

arrow
Projects Image

Kuwait Flour Mills and Bakeries Company (KSC)

Oracle ERP Solution

arrow

DGCA

The Kuwait Airport Data Interchange Network (KADIN) is designed to be the single unified communications infrastructure at Kuwait International Airport, connecting facilities as required. KADIN comprises an outside infrastructure consisting of manholes, hand holes, duct banks and single mode F.O. cabling, and active equipment forming an IP/MPLS cloud with associated network management and traffic engineering capabilities. KADIN currently serves predominantly Air Traffic Management, Air Navigation and Meteorological systems at Kuwait International airport. The KADIN IP/MPLS cloud has the capability to develop into the intended single communications infrastructure for the airport. The KADIN+ project builds upon the KADIN project at Kuwait International Airport.

Design, Manufacture, Supply, Installation, Commissioning, Providing of Training, Warranty, Maintenance and Technical Support of KADIN Expansion & PABX Integration at Kuwait International Airport (KADIN Plus). The Scope of work undertaken is summarized as follows:.

  • Local Area Networks for the new Air Traffic Control Tower
  • Rationalization of KADIN 
  • Increase of capacity and bandwidth
  • Increase of Functionality 
  • Connection of new facilities. 
  • OSP & Civil works.

Ministry of Interior

The main objective of the Maintenance Support service is to ensure the integrity and proper functioning of all system components by performing the following activities:

  • Performing regular preventive / repair and corrective maintenance which consists of maintenance for Outdoor Fixed cameras, Indoor Fixed Dome cameras, Video Recorder system, Access switches, UPS system, Fiber Patch panels & Electrical DB
  • To prepare all necessary maintenance schedules (PM & CM)
  • Replacing faulty items using spare parts 
  • Providing maintenance support for the staff 
  • Reporting the systems performance to the customer

Kuwait Ports Authority

The system comprises of and implements the following equipments/subsystems and then auxiliary.

ACC has borne complete responsibility of procurement / development of all the above equipment/sub-stems. These responsibilities include installation, commissioning and testing of the complete system including the interfacing of all the equipments. The details of civil works carried out for the total execution are:-

  • Tracking System. 
  • VTMS Computer System.
  • AIS System.
  • VHF System. 
  • CCTV system 
  • Voice recording and replay system. 
  • Communication Link (Microwave Link). 
  • Meteorological sensors.
  • Electrical Power System (including UPS and Generators).
  • Electrical Power System (including UPS and Generators.

Kuwait Fire Force

Turnkey solution including survey, design, delivery, installation, commissioning, training, warranty, and maintenance support for a Microwave communication network and related subsystems to support and extend backhaul operations between KFSD Control Centers and fixed and mobile assets.

The required microwave network integrates with and extends existing network services. The network is based on open digital standards for public safety as a Turnkey solution including all hardware, software, and civil infrastructure components.

Ministry of Defense

CSS and Communications Equipment - Installation, Integration, Configuration, Testing, Commissioning, As-builts, OMSI, Training etc. for the following Sub-systems:

  • CSS Coastal Surveillance System
  • CIP Software Application (CIP - Critical Infrastructure Protection)
  • Tactical Radar System (Antenna, ACU, Transceivers, Waveguides)
  • Long / Short Range Camera
  • Thermal Sensors
  • AIS Base Station Transponder
  • Audio / Video Recording Servers
  • Bridge Consoles
  • METEO Weather Station
  • GMDSS System
  • HF Radios /Maritime VHF
  • Aeronautical VHF/UHF
  • Tetra Radios
  • Multiband Networking Manpack Radio
  • HF Software Defined Radio
  • Wideband HF/VHF Tactical Radio System
  • Radio Base Station
  • IP Advanced Radio System
  • TVRO Solution
  • LAN for Office & Voice Networks
  • Wireless LAN
  • UPS system
  • Aeronautical Non-directional Beacon
  • Radio Dispatching and Recording Systems

DGCA AVIC

The scope consists of connecting the applications interface cables & fiber cables to the KADIN racks/ and connecting the racks to room bus and electrical DB in existing grounded trays.

Kuwait National Guard

The Information security enhancement program contains the following:


Part 1: Cybersecurity solutions and services:

    Products Implementation Requirements:

  • Content security (Email) 
  • Data center security 
  • Identity security(only 802.1x) 
  • Network flow security analysis 
  • Malware protection and sandboxing 
  • DNS security 
  • Security Operations Management 
  • End points security 
  • Threat Intelligence 
  • Layer 4 data encryption solution 
  • Products implementations professional services
  • Managed Detect and Response Services (MDR):

  • 24x7 Security Monitoring Service
  • Incident Response Service
  • Proactive Threat Hunting

Part 2: Project Management and Cybersecurity Consultancy Services;

  • Project Management Professional Services 
  • Cybersecurity Strategy 
  • Detailed Cybersecurity Framework 
  • Maturity Model Assessment 
  • Risk Assessment and Recommendations 
  • IT Consolidated Asset Register 
  • Security Posture Assessment 
  • Incident Response Process Development
  • Security Policy and Procedure
  • ISO 27001 Assessment and Gaps Report
  • ISO 27001 Certification
  • Security Roadmap

DGCA - Intelcan

The sole and primary objective of this Subcontract is to perform the Civil Works required for the installation of the ILS systems (LLZ15R, GP15R, LLZ33L and GP33L) and complete installation of the power infrastructure to energize and earthing the ILS elements. Civil works includes - Concrete foundations for antennas, shelters, Field Test Paths and Test Points, Trenching and Piping, Access Road and Parking Lot.

DGCA - Intelcan

The sole and primary objective of this Subcontract is to connect the ILS systems (LLZ15R, GP15R, LLZ33L and GP33L) to the KADIN system, similar to the KADIN connection of the existing runways in TURN KEY conditions.

Ministry of Interior

The main objective of the Maintenance Support service is to ensure the integrity and proper functioning of all system components through the following activities:

  • Performing regular preventive / repair and corrective maintenance which consists of maintenance for Core switches, Access switches, call manager, Executive Phone, Business Phone, PSTN digital Voice gateway, Unite unified Messaging For 200 users with Enterprise Messaging system for 500 users, Servers, electrical items at Server room, Fire Alarm system, CCTV system, Access control system, UPS system, FOC cables between HQ and border sites, EQ Cabinets, Cabling system & Data points distribution. 
  • Preparing all necessary maintenance schedules (PM & CM)
  • Replacing faulty items using spare parts 
  • Providing maintenance support for the trained staff.
  • Providing maintenance training for the new staff 
  • Reporting the systems performance to the customer.

On-site maintenance support as per the MOI working time and on call 24-hours per day to maintain the system performance.

Public Authority for Industry

Supply, installation and maintenance for 75 Km of 48 Core fiber optic cable, and 1 km of 12 core fiber optic cable for the Public Authority of Industry, to establish optical fiber links connectivity from Head Quarter (South Surra) to Six of PAI locations i.e Sulaibia , Ardiya, Mina Abdullah, Free Zone, Airport and Fahaheel Area.

DEERNS

Supply, Installation, Commissioning, Providing of Training, Warranty, Maintenance & Technical Support of Document Control System (DCS) at DGCA Planning & Control Dept. and other beneficiary Depts related to Meteorology & Navigational Projects.

  • Document Control System.
  • Networking cabling.
  • Computer room preparation and cablings.
  • Network Management Systems.
  • Cable Management System Specific Training.

Public Authority of Manpower

Supply, installation and maintenance for 40 Km of 12 Core fiber optic cable for the Public Authority of Manpower, connecting 9 PAM facilities to the nearest MOC exchange along with terminating and testing all fiber optic cables.

Phase II is under execution, consisting of installation for 35 KM of 12 Core Fiber optic cable connecting 5 PAM facilities to the nearest MOC exchange along with terminating and testing all fiber optic cables.

Ministry of Communication

ACC- Subcontractor of Huawei and its scope of work as follows:

  • Detailed demand survey and identification of the number of building of houses by vacant plots, under construction.
  • Supply of all civil materials, tools and vehicles to perform all services related to civil works for laying PVC 110 pipes, construction of handholes, manholes, etc to allow pulling subducts, fiber optic cables.
  • Splicing and termination of Fiber Optic Cables inside MOC exchanges and customer home/buildings.
  • Installation of FTTH/GPON components, like splitter cabinets/closures termination box.
  • Conducting the Optical Test measurements (OTDR, OLTS).
  • As-built Documentation in AutoCAD.

Kuwait Ports Authority

A wide range of Sensors System Connectivity for Port Authority including:-


  • Radio Communications & recorders.
  • Maritime Sensors. 
  • Weather Sensors. 
  • Oceanographic Sensors. 
  • Telemetry Network and Unified Sensors Display Application. 
  • Installation in Port Towers, Under sea water and in ships. 
  • Data transfer and communication devices .
  • Communication and information transfer systems.
  • LAN / WAN.

National Bank of Kuwait

Supply and installation fiber optic cable for NBK backbone infrastructure, connecting all NBK branches to HQ.

Scope of work:

  • 60Km of 96Core FOC and required OSP civil works.
  • Network Cabling, Site preparation and Cabling.

Kuwait National Guard

ACC- Subcontractor of Huawei and its scope of work as follows: Implementation of several Application-Suites that are based on SAP, IBM, Microsoft and OpenText platforms, in addition to the migration of legacy data as well as digitization services. Works covers complete a single integration services bus platform across all systems / subsystems as well as with external entities government entities such as Ministry of Health, Civil Service Commission, Public Institute for Social Security, Ministry of Interior, etc...

The List of Applications-Suites includes:

  • SAP Project Management System 
  • SAP IT Service Desk 
  • OpenText Enterprise Content Management (ECM) 
  • OpenText Graphics and image processing software 
  • OpenText Statistical software 
  • OpenText image systems 
  • OpenText Correspondence Management System (CMS) 
  • Electronic corresponded system
  • Medical Information System, Dental System 
  • SAP Planning System (including corporate strategic planning) 
  • SAP Human Resources Management System (HRMS) 
  • SAP Portal, SAP Business Intelligence 
  • Data banks services 
  • Technical support administration system and virtual infrastructure admin system 
  • IBM Maximo Enhancement Services 
  • Specific training, Supportive training.

DGCA

As the Local Agent for Leonardo, the subcontract is signed under the name of FLC, an entity fully owned by ACC (works are fully performed by ACC employees). Scope of work includes site management, field survey, design, installation testing and commissioning under the supervision of Leonardo Engineers of the complete Kuwait Airport Data Interchange Network (KADIN).

Also, the work includes OSP and Civil Works Activities, Project Administration, CMS, Penetration Testing, Application Interfacing HW, Cisco Training Logistics, Network Sync Equipment, Test Equipment, Electrical Telephone Explosion & Weatherproof, Furniture & Console.

Main Scope:

  • Data transfer and communication devices.
  • Communication and information transfer systems.
  • IP-MPLS Core, Edge, and CPE Access Network. 
  • LAN / WAN.
  • Networking cabling.
  • KCMC LAN, Wifi, iPBX, DNS & DHCP servers. 
  • Transition of Airport Applications to the IP-MPLS Network ·Computer room preparation and cablings.
  • Main and Backup Data Centers. 
  • Communications Management Centre and Communications Back Up Centre.
  • Outside Fiber Optic & Civil Work Plant across the Airport and Runways.
  • Inside Fiber Optic & Civil Work Plant for Sites.
  • Network Admin, capacity management and performance monitoring and load follow up.
  • Main & Backup Umbrella Management Centers (NoC).
  • Network Management Systems.
  • Cable Management System. 
  • Information security and privacy. 
  • Security & privacy software.
  • Monitoring and control systems. 
  • Intrusion detection systems. 
  • SNS Block and Security Network System (Firewalls etc.).
  • Power Systems General basic training, Specific training, Supportive training.

Ministry of Defense Kuwait

ACC- Subcontractor of Huawei and its scope of work as follows: Implementation of the OSP portion of the Secured Alternate Communication Optical Network (SACON) for the Cooperation Council for the Arab States of the Gulf (CCASG) in Kuwait.

Scope of work:

  • 350Km of OSP Infrastructure within Kuwait area.
  • Network Cabling.
  • Site preparation and Cabling.

Kuwait Fire Service Directorate

Upgrade of the network included optimization of the entire Radio Network, GMDSS & Radars for the Sea Rescue stations, IP-PBX for the operation centers and fire stations, new Dispatches solution for the Operation Centers, Accident Management & Reporting solution for the Center and the Fire Stations, and audio loggers.

Upgrade of the KFSD Radio Network and various services including: Support for the Radio Communications Systems (two Centers, 6 Repeaters, 40 Fire Stations, and Over 500 Mobile & Handheld Radios), PBX, IPPBX, GMDSS, Radars, Sonars, Sounders, Weather Stations, Display, PBX Systems, Fiber Optic Systems, Recording Systems, Network Monitoring Systems, Networking Equipment, Unix & NT Servers, Touch Screens Dispatch System, Maximo & Oracle Maintenance and Data Entry Systems, Towers.

  • Data transfer and communication devices.
  • Communication and information transfer systems.
  • LAN / WAN.
  • Networking cabling.
  • Computer room preparation and cablings.
  • Monitoring and control systems.
  • General basic training, Specific training, Supportive training.

Kuwait Oil Company (KSC)

Supply and installation of fiber optic cable, construction of duct system over 2000km comprising Manholes / Handholes with DWC HDPE ducts and HDPE sub-ducts laid in one of the ducts.

Scope of work:

  • 1000km of 48Core Fiber optic cable laid by cable blowing technique, connecting more than 90 buildings to KOC Main.
  • Network Cabling.
  • Site preparation and Cabling.

Ministry Of Interior

NW & OSP Infrastructure - Cisco (Core switches, routers, Access switches).

  • Supply and installation of Fiber cables connecting MOI to MOC Exchanges.
  • Connecting fiber cables in the specified exchanges with the ISP cabinet in those exchanges with all needed patches and connections.
  • All the connections and terminations with the ISP managing MOI.
  • Supply, installation and configuration of Cisco equipment.
  • Data transfer and communication devices.
  • Communication and information transfer systems.
  • LAN / WAN.

Kuwait Danish Dairy Company

Turnkey Project Campus Network including:

  • 29 GE Edge Switches
  • Two fully redundant Cisco 6500 Core Switches
  • Connect Server Farm & Users
  • Cisco Works Network Management System
  • Laying Fiber and UTP Cables
  • Servers, PC, Handhelds, UPS’s, Disaster Recovery and Backup services

Complete Data Center Services:

  • Oracle EBusiness Suite
  • Financials, SCM, OPM, HRMS
  • Maximo EAM
  • Maintenance & Material Management, and IT Service Management
  • Documentum (On-going)
  • Document Management Services, File-shares, AutoCAD Integration
  • Integration Services across the ERP suites
  • Cisco Data Network
  • Complete Campus Infrastructure: wireless, fiber, radio
  • HP & IBM Computer
  • Hardware Servers, Workstations, and peripherals
  • DAP & Symbol/Motorola Handheld Computers and peripherals
  • Large Scale Power Protection Services
  • Data transfer and communication devices
  • Communication and information transfer systems
  • LAN / WAN
  • Monitoring and control systems

Ministry of Information

  • 155 Ch. Monitoring & Archive System for Sat. TV, Earth TV, DBV-T, DAB, FM/AM Broadcast
  • Digital Audio Broadcast (DAB)
  • SDH Fiber Network connecting FM, AM, TV Broadcast Studios to Broadcast Stations
  • Logger/Archive System post Broadcast Studios and past transmission over fiber SDH & into Broadcast Stations.
  • SDH FOC System Link to MOC and GCC over the FOG for carrying Live Feeds between GCC countries.
  • SDH FOC System Link to MOC and GCC over the FOG for carrying Live Feeds between GCC countries.
  • Broadcast Monitoring, Direction Finding, & Measurement Vehicle.
  • Satellite News Gathering Vehicle (SNG).
  • Mobile Radio Broadcast Monitoring Station.
  • Various Maintenance Project.
  • Data transfer and communication devices.
  • Communication and information transfer systems, LAN / WAN.

Ministry of Communication

Supply, installation, testing and operation and maintenance of the wireless phone system (WLL) for 20 Thousand lines.

  • Turnkey Integrated System
  • Operation & Maintenance
  • Fixed and mobile cellular
  • 20,000 Telephone Lines
  • 99.5% coverage for 10 areas
  • Connect with all MoC exchanges
  • Fiber & Microwave Transmission
  • Tower & Shelters
  • Connect with MoC Auto Disconnect
  • First commercial CDMA in the MEA
  • Data transfer and communication devices
  • Communication and information transfer systems
  • LAN / WAN

Kuwait Oil Company

The Scope of Work primarily handled the replacement of the Indus Passport System with IBM Maximo Enterprise Asset Management and the implementation of e-Business.

Implementation covered the following:

  • Management of Maintenance
  • Materials
  • Contracts
  • Data repositories for Assets Hierarchy
  • Labor records
  • Job Plans
  • Inventory Items
  • Contracts line items
  • Specific industry for IT Service Management
  • Transportation
  • Scheduling, Calibration
  • GIS
  • Linear, and Oil and Gas
  • Data Cleansing, Data Collection
  • Data Management exercise catering for Inventory Items Cataloguing, Purchasing Contracts Data Cleansing, Assets Data Cleansing
  • Software solutions (sites, portals, e-services, content management), etc.

The Implementation phase of the project was completed at the end of 2010. The eBEAMS project went Live on 9 January, 2011 and the maintenance support phase went live from August 2011. The contract period ended in 2015.

National Bank Of Kuwait

Turnkey Integrated Project for NBK

  • Design, Delivery, Commissioning of a Broadband Microwave Network
  • Link all Branches to the HQ Data Center
  • Link over 70 NBK centers
  • Dual Fiber Ring over HQ and Kuwait towers
  • Connects Edge to Core Cisco Switches and Routers
  • Eliminates dependence on Service providers
  • 24/7/2 Maintenance Support
  • Continual upgrading and adding of new branches
  • Data transfer and communication devices
  • Communication and information transfer systems
  • LAN / WAN

Kuwait National Petroleum Company (KSC)

ACC implemented the KIMS Maximo project to replace KNPC’s core business systems in:

  • Maintenance Management.
  • Materials Management.
  • Procurement, and Contracts.

ACC made use of IBM Maximo package, which was selected as the best of breed solution to address the requirements of KNPC.

The contract was further extended to cover the supply, installation and maintenance of the IT side of the project (development servers, PCs, printers, networking components, facsimile machines, photocopiers, etc.)

Kuwait National Guard

The implementation followed the guidelines of a Military organization covering:

  • Stores & Inventory Control (Civil & Military)
  • Maintenance (Civil & Military)
  • Logistics (Integration with other systems and MIS)
  • Transportation (Civil & Military)
  • Services Management, Fixed Assets, Purchase Orders,
  • Contract Management and Administration,
  • Financial Projections (Budgetary),
  • Accounts Payable, and Financials Integration.

The contract was later extended to cover the supply, installation, and maintenance of the IT side of the project (Server, PCs, Printers, Handhelds, and Networking components).

Kuwait Flour Mills and Bakeries Company (KSC)

The project includes a scope of activities from As-Is business requirement study, to developing To-Be business processes, functional specifications, configuration and customization of the proposed ERP solution:

  • Data Conversion
  • DBA Services
  • User Acceptance Test
  • Performance testing
  • Roll out
  • Stabilization
  • Specific training, Supportive training
  • Post go-live support etc.
Projects Image

Kuwait Livestock Transport & Trading Company

Oracle E-Business Suite Application Modules

arrow

DGCA

The Kuwait Airport Data Interchange Network (KADIN) is designed to be the single unified communications infrastructure at Kuwait International Airport, connecting facilities as required. KADIN comprises an outside infrastructure consisting of manholes, hand holes, duct banks and single mode F.O. cabling, and active equipment forming an IP/MPLS cloud with associated network management and traffic engineering capabilities. KADIN currently serves predominantly Air Traffic Management, Air Navigation and Meteorological systems at Kuwait International airport. The KADIN IP/MPLS cloud has the capability to develop into the intended single communications infrastructure for the airport. The KADIN+ project builds upon the KADIN project at Kuwait International Airport.

Design, Manufacture, Supply, Installation, Commissioning, Providing of Training, Warranty, Maintenance and Technical Support of KADIN Expansion & PABX Integration at Kuwait International Airport (KADIN Plus). The Scope of work undertaken is summarized as follows:.

  • Local Area Networks for the new Air Traffic Control Tower
  • Rationalization of KADIN 
  • Increase of capacity and bandwidth
  • Increase of Functionality 
  • Connection of new facilities. 
  • OSP & Civil works.

Ministry of Interior

The main objective of the Maintenance Support service is to ensure the integrity and proper functioning of all system components by performing the following activities:

  • Performing regular preventive / repair and corrective maintenance which consists of maintenance for Outdoor Fixed cameras, Indoor Fixed Dome cameras, Video Recorder system, Access switches, UPS system, Fiber Patch panels & Electrical DB
  • To prepare all necessary maintenance schedules (PM & CM)
  • Replacing faulty items using spare parts 
  • Providing maintenance support for the staff 
  • Reporting the systems performance to the customer

Kuwait Ports Authority

The system comprises of and implements the following equipments/subsystems and then auxiliary.

ACC has borne complete responsibility of procurement / development of all the above equipment/sub-stems. These responsibilities include installation, commissioning and testing of the complete system including the interfacing of all the equipments. The details of civil works carried out for the total execution are:-

  • Tracking System. 
  • VTMS Computer System.
  • AIS System.
  • VHF System. 
  • CCTV system 
  • Voice recording and replay system. 
  • Communication Link (Microwave Link). 
  • Meteorological sensors.
  • Electrical Power System (including UPS and Generators).
  • Electrical Power System (including UPS and Generators.

Kuwait Fire Force

Turnkey solution including survey, design, delivery, installation, commissioning, training, warranty, and maintenance support for a Microwave communication network and related subsystems to support and extend backhaul operations between KFSD Control Centers and fixed and mobile assets.

The required microwave network integrates with and extends existing network services. The network is based on open digital standards for public safety as a Turnkey solution including all hardware, software, and civil infrastructure components.

Ministry of Defense

CSS and Communications Equipment - Installation, Integration, Configuration, Testing, Commissioning, As-builts, OMSI, Training etc. for the following Sub-systems:

  • CSS Coastal Surveillance System
  • CIP Software Application (CIP - Critical Infrastructure Protection)
  • Tactical Radar System (Antenna, ACU, Transceivers, Waveguides)
  • Long / Short Range Camera
  • Thermal Sensors
  • AIS Base Station Transponder
  • Audio / Video Recording Servers
  • Bridge Consoles
  • METEO Weather Station
  • GMDSS System
  • HF Radios /Maritime VHF
  • Aeronautical VHF/UHF
  • Tetra Radios
  • Multiband Networking Manpack Radio
  • HF Software Defined Radio
  • Wideband HF/VHF Tactical Radio System
  • Radio Base Station
  • IP Advanced Radio System
  • TVRO Solution
  • LAN for Office & Voice Networks
  • Wireless LAN
  • UPS system
  • Aeronautical Non-directional Beacon
  • Radio Dispatching and Recording Systems

DGCA AVIC

The scope consists of connecting the applications interface cables & fiber cables to the KADIN racks/ and connecting the racks to room bus and electrical DB in existing grounded trays.

Kuwait National Guard

The Information security enhancement program contains the following:


Part 1: Cybersecurity solutions and services:

    Products Implementation Requirements:

  • Content security (Email) 
  • Data center security 
  • Identity security(only 802.1x) 
  • Network flow security analysis 
  • Malware protection and sandboxing 
  • DNS security 
  • Security Operations Management 
  • End points security 
  • Threat Intelligence 
  • Layer 4 data encryption solution 
  • Products implementations professional services
  • Managed Detect and Response Services (MDR):

  • 24x7 Security Monitoring Service
  • Incident Response Service
  • Proactive Threat Hunting

Part 2: Project Management and Cybersecurity Consultancy Services;

  • Project Management Professional Services 
  • Cybersecurity Strategy 
  • Detailed Cybersecurity Framework 
  • Maturity Model Assessment 
  • Risk Assessment and Recommendations 
  • IT Consolidated Asset Register 
  • Security Posture Assessment 
  • Incident Response Process Development
  • Security Policy and Procedure
  • ISO 27001 Assessment and Gaps Report
  • ISO 27001 Certification
  • Security Roadmap

DGCA - Intelcan

The sole and primary objective of this Subcontract is to perform the Civil Works required for the installation of the ILS systems (LLZ15R, GP15R, LLZ33L and GP33L) and complete installation of the power infrastructure to energize and earthing the ILS elements. Civil works includes - Concrete foundations for antennas, shelters, Field Test Paths and Test Points, Trenching and Piping, Access Road and Parking Lot.

DGCA - Intelcan

The sole and primary objective of this Subcontract is to connect the ILS systems (LLZ15R, GP15R, LLZ33L and GP33L) to the KADIN system, similar to the KADIN connection of the existing runways in TURN KEY conditions.

Ministry of Interior

The main objective of the Maintenance Support service is to ensure the integrity and proper functioning of all system components through the following activities:

  • Performing regular preventive / repair and corrective maintenance which consists of maintenance for Core switches, Access switches, call manager, Executive Phone, Business Phone, PSTN digital Voice gateway, Unite unified Messaging For 200 users with Enterprise Messaging system for 500 users, Servers, electrical items at Server room, Fire Alarm system, CCTV system, Access control system, UPS system, FOC cables between HQ and border sites, EQ Cabinets, Cabling system & Data points distribution. 
  • Preparing all necessary maintenance schedules (PM & CM)
  • Replacing faulty items using spare parts 
  • Providing maintenance support for the trained staff.
  • Providing maintenance training for the new staff 
  • Reporting the systems performance to the customer.

On-site maintenance support as per the MOI working time and on call 24-hours per day to maintain the system performance.

Public Authority for Industry

Supply, installation and maintenance for 75 Km of 48 Core fiber optic cable, and 1 km of 12 core fiber optic cable for the Public Authority of Industry, to establish optical fiber links connectivity from Head Quarter (South Surra) to Six of PAI locations i.e Sulaibia , Ardiya, Mina Abdullah, Free Zone, Airport and Fahaheel Area.

DEERNS

Supply, Installation, Commissioning, Providing of Training, Warranty, Maintenance & Technical Support of Document Control System (DCS) at DGCA Planning & Control Dept. and other beneficiary Depts related to Meteorology & Navigational Projects.

  • Document Control System.
  • Networking cabling.
  • Computer room preparation and cablings.
  • Network Management Systems.
  • Cable Management System Specific Training.

Public Authority of Manpower

Supply, installation and maintenance for 40 Km of 12 Core fiber optic cable for the Public Authority of Manpower, connecting 9 PAM facilities to the nearest MOC exchange along with terminating and testing all fiber optic cables.

Phase II is under execution, consisting of installation for 35 KM of 12 Core Fiber optic cable connecting 5 PAM facilities to the nearest MOC exchange along with terminating and testing all fiber optic cables.

Ministry of Communication

ACC- Subcontractor of Huawei and its scope of work as follows:

  • Detailed demand survey and identification of the number of building of houses by vacant plots, under construction.
  • Supply of all civil materials, tools and vehicles to perform all services related to civil works for laying PVC 110 pipes, construction of handholes, manholes, etc to allow pulling subducts, fiber optic cables.
  • Splicing and termination of Fiber Optic Cables inside MOC exchanges and customer home/buildings.
  • Installation of FTTH/GPON components, like splitter cabinets/closures termination box.
  • Conducting the Optical Test measurements (OTDR, OLTS).
  • As-built Documentation in AutoCAD.

Kuwait Ports Authority

A wide range of Sensors System Connectivity for Port Authority including:-


  • Radio Communications & recorders.
  • Maritime Sensors. 
  • Weather Sensors. 
  • Oceanographic Sensors. 
  • Telemetry Network and Unified Sensors Display Application. 
  • Installation in Port Towers, Under sea water and in ships. 
  • Data transfer and communication devices .
  • Communication and information transfer systems.
  • LAN / WAN.

National Bank of Kuwait

Supply and installation fiber optic cable for NBK backbone infrastructure, connecting all NBK branches to HQ.

Scope of work:

  • 60Km of 96Core FOC and required OSP civil works.
  • Network Cabling, Site preparation and Cabling.

Kuwait National Guard

ACC- Subcontractor of Huawei and its scope of work as follows: Implementation of several Application-Suites that are based on SAP, IBM, Microsoft and OpenText platforms, in addition to the migration of legacy data as well as digitization services. Works covers complete a single integration services bus platform across all systems / subsystems as well as with external entities government entities such as Ministry of Health, Civil Service Commission, Public Institute for Social Security, Ministry of Interior, etc...

The List of Applications-Suites includes:

  • SAP Project Management System 
  • SAP IT Service Desk 
  • OpenText Enterprise Content Management (ECM) 
  • OpenText Graphics and image processing software 
  • OpenText Statistical software 
  • OpenText image systems 
  • OpenText Correspondence Management System (CMS) 
  • Electronic corresponded system
  • Medical Information System, Dental System 
  • SAP Planning System (including corporate strategic planning) 
  • SAP Human Resources Management System (HRMS) 
  • SAP Portal, SAP Business Intelligence 
  • Data banks services 
  • Technical support administration system and virtual infrastructure admin system 
  • IBM Maximo Enhancement Services 
  • Specific training, Supportive training.

DGCA

As the Local Agent for Leonardo, the subcontract is signed under the name of FLC, an entity fully owned by ACC (works are fully performed by ACC employees). Scope of work includes site management, field survey, design, installation testing and commissioning under the supervision of Leonardo Engineers of the complete Kuwait Airport Data Interchange Network (KADIN).

Also, the work includes OSP and Civil Works Activities, Project Administration, CMS, Penetration Testing, Application Interfacing HW, Cisco Training Logistics, Network Sync Equipment, Test Equipment, Electrical Telephone Explosion & Weatherproof, Furniture & Console.

Main Scope:

  • Data transfer and communication devices.
  • Communication and information transfer systems.
  • IP-MPLS Core, Edge, and CPE Access Network. 
  • LAN / WAN.
  • Networking cabling.
  • KCMC LAN, Wifi, iPBX, DNS & DHCP servers. 
  • Transition of Airport Applications to the IP-MPLS Network ·Computer room preparation and cablings.
  • Main and Backup Data Centers. 
  • Communications Management Centre and Communications Back Up Centre.
  • Outside Fiber Optic & Civil Work Plant across the Airport and Runways.
  • Inside Fiber Optic & Civil Work Plant for Sites.
  • Network Admin, capacity management and performance monitoring and load follow up.
  • Main & Backup Umbrella Management Centers (NoC).
  • Network Management Systems.
  • Cable Management System. 
  • Information security and privacy. 
  • Security & privacy software.
  • Monitoring and control systems. 
  • Intrusion detection systems. 
  • SNS Block and Security Network System (Firewalls etc.).
  • Power Systems General basic training, Specific training, Supportive training.

Ministry of Defense Kuwait

ACC- Subcontractor of Huawei and its scope of work as follows: Implementation of the OSP portion of the Secured Alternate Communication Optical Network (SACON) for the Cooperation Council for the Arab States of the Gulf (CCASG) in Kuwait.

Scope of work:

  • 350Km of OSP Infrastructure within Kuwait area.
  • Network Cabling.
  • Site preparation and Cabling.

Kuwait Fire Service Directorate

Upgrade of the network included optimization of the entire Radio Network, GMDSS & Radars for the Sea Rescue stations, IP-PBX for the operation centers and fire stations, new Dispatches solution for the Operation Centers, Accident Management & Reporting solution for the Center and the Fire Stations, and audio loggers.

Upgrade of the KFSD Radio Network and various services including: Support for the Radio Communications Systems (two Centers, 6 Repeaters, 40 Fire Stations, and Over 500 Mobile & Handheld Radios), PBX, IPPBX, GMDSS, Radars, Sonars, Sounders, Weather Stations, Display, PBX Systems, Fiber Optic Systems, Recording Systems, Network Monitoring Systems, Networking Equipment, Unix & NT Servers, Touch Screens Dispatch System, Maximo & Oracle Maintenance and Data Entry Systems, Towers.

  • Data transfer and communication devices.
  • Communication and information transfer systems.
  • LAN / WAN.
  • Networking cabling.
  • Computer room preparation and cablings.
  • Monitoring and control systems.
  • General basic training, Specific training, Supportive training.

Kuwait Oil Company (KSC)

Supply and installation of fiber optic cable, construction of duct system over 2000km comprising Manholes / Handholes with DWC HDPE ducts and HDPE sub-ducts laid in one of the ducts.

Scope of work:

  • 1000km of 48Core Fiber optic cable laid by cable blowing technique, connecting more than 90 buildings to KOC Main.
  • Network Cabling.
  • Site preparation and Cabling.

Ministry Of Interior

NW & OSP Infrastructure - Cisco (Core switches, routers, Access switches).

  • Supply and installation of Fiber cables connecting MOI to MOC Exchanges.
  • Connecting fiber cables in the specified exchanges with the ISP cabinet in those exchanges with all needed patches and connections.
  • All the connections and terminations with the ISP managing MOI.
  • Supply, installation and configuration of Cisco equipment.
  • Data transfer and communication devices.
  • Communication and information transfer systems.
  • LAN / WAN.

Kuwait Danish Dairy Company

Turnkey Project Campus Network including:

  • 29 GE Edge Switches
  • Two fully redundant Cisco 6500 Core Switches
  • Connect Server Farm & Users
  • Cisco Works Network Management System
  • Laying Fiber and UTP Cables
  • Servers, PC, Handhelds, UPS’s, Disaster Recovery and Backup services

Complete Data Center Services:

  • Oracle EBusiness Suite
  • Financials, SCM, OPM, HRMS
  • Maximo EAM
  • Maintenance & Material Management, and IT Service Management
  • Documentum (On-going)
  • Document Management Services, File-shares, AutoCAD Integration
  • Integration Services across the ERP suites
  • Cisco Data Network
  • Complete Campus Infrastructure: wireless, fiber, radio
  • HP & IBM Computer
  • Hardware Servers, Workstations, and peripherals
  • DAP & Symbol/Motorola Handheld Computers and peripherals
  • Large Scale Power Protection Services
  • Data transfer and communication devices
  • Communication and information transfer systems
  • LAN / WAN
  • Monitoring and control systems

Ministry of Information

  • 155 Ch. Monitoring & Archive System for Sat. TV, Earth TV, DBV-T, DAB, FM/AM Broadcast
  • Digital Audio Broadcast (DAB)
  • SDH Fiber Network connecting FM, AM, TV Broadcast Studios to Broadcast Stations
  • Logger/Archive System post Broadcast Studios and past transmission over fiber SDH & into Broadcast Stations.
  • SDH FOC System Link to MOC and GCC over the FOG for carrying Live Feeds between GCC countries.
  • SDH FOC System Link to MOC and GCC over the FOG for carrying Live Feeds between GCC countries.
  • Broadcast Monitoring, Direction Finding, & Measurement Vehicle.
  • Satellite News Gathering Vehicle (SNG).
  • Mobile Radio Broadcast Monitoring Station.
  • Various Maintenance Project.
  • Data transfer and communication devices.
  • Communication and information transfer systems, LAN / WAN.

Ministry of Communication

Supply, installation, testing and operation and maintenance of the wireless phone system (WLL) for 20 Thousand lines.

  • Turnkey Integrated System
  • Operation & Maintenance
  • Fixed and mobile cellular
  • 20,000 Telephone Lines
  • 99.5% coverage for 10 areas
  • Connect with all MoC exchanges
  • Fiber & Microwave Transmission
  • Tower & Shelters
  • Connect with MoC Auto Disconnect
  • First commercial CDMA in the MEA
  • Data transfer and communication devices
  • Communication and information transfer systems
  • LAN / WAN

Kuwait Oil Company

The Scope of Work primarily handled the replacement of the Indus Passport System with IBM Maximo Enterprise Asset Management and the implementation of e-Business.

Implementation covered the following:

  • Management of Maintenance
  • Materials
  • Contracts
  • Data repositories for Assets Hierarchy
  • Labor records
  • Job Plans
  • Inventory Items
  • Contracts line items
  • Specific industry for IT Service Management
  • Transportation
  • Scheduling, Calibration
  • GIS
  • Linear, and Oil and Gas
  • Data Cleansing, Data Collection
  • Data Management exercise catering for Inventory Items Cataloguing, Purchasing Contracts Data Cleansing, Assets Data Cleansing
  • Software solutions (sites, portals, e-services, content management), etc.

The Implementation phase of the project was completed at the end of 2010. The eBEAMS project went Live on 9 January, 2011 and the maintenance support phase went live from August 2011. The contract period ended in 2015.

National Bank Of Kuwait

Turnkey Integrated Project for NBK

  • Design, Delivery, Commissioning of a Broadband Microwave Network
  • Link all Branches to the HQ Data Center
  • Link over 70 NBK centers
  • Dual Fiber Ring over HQ and Kuwait towers
  • Connects Edge to Core Cisco Switches and Routers
  • Eliminates dependence on Service providers
  • 24/7/2 Maintenance Support
  • Continual upgrading and adding of new branches
  • Data transfer and communication devices
  • Communication and information transfer systems
  • LAN / WAN

Kuwait National Petroleum Company (KSC)

ACC implemented the KIMS Maximo project to replace KNPC’s core business systems in:

  • Maintenance Management.
  • Materials Management.
  • Procurement, and Contracts.

ACC made use of IBM Maximo package, which was selected as the best of breed solution to address the requirements of KNPC.

The contract was further extended to cover the supply, installation and maintenance of the IT side of the project (development servers, PCs, printers, networking components, facsimile machines, photocopiers, etc.)

Kuwait National Guard

The implementation followed the guidelines of a Military organization covering:

  • Stores & Inventory Control (Civil & Military)
  • Maintenance (Civil & Military)
  • Logistics (Integration with other systems and MIS)
  • Transportation (Civil & Military)
  • Services Management, Fixed Assets, Purchase Orders,
  • Contract Management and Administration,
  • Financial Projections (Budgetary),
  • Accounts Payable, and Financials Integration.

The contract was later extended to cover the supply, installation, and maintenance of the IT side of the project (Server, PCs, Printers, Handhelds, and Networking components).

Kuwait Flour Mills and Bakeries Company (KSC)

The project includes a scope of activities from As-Is business requirement study, to developing To-Be business processes, functional specifications, configuration and customization of the proposed ERP solution:

  • Data Conversion
  • DBA Services
  • User Acceptance Test
  • Performance testing
  • Roll out
  • Stabilization
  • Specific training, Supportive training
  • Post go-live support etc.

Kuwait Livestock Transport & Trading Company

ACC provides consultancy services and implementation of Oracle E-Business Suite Application Modules including the following modules:

  • Finance
  • Supply Chain
  • HR
  • Manufacturing
  • Quality
  • Sales & Distribution
  • Maintenance
  • Specific training, Supportive training
  • Documentum
  • Document Management Services, File-shares